Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mrvc/W/111/R
|
| Description |
Execution Of P Way/ Track Linking Works Including Supply Of P Way Materials (Excluding Supply Of Rails And Psc Main Line And Special Sleepers) And Supply Of Ballast. Yard Remodelling. Laying Of Turnouts, Sej And Other Miscellaneous Works.
|
| Organisation | Ministry of Railways - World Bank Tenders | Central Govt. Ministry/Department |
| Tender Id | 2024_MRVC_794962_1 |
|
Reference Number |
MRVC/W/111/R |
| Tender Fee | 0 |
| EMD | 36.28 Lakh |
| Tender Value | - |
| Place | Panvel-Karjat |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=835599 |
| Start Date | March 21, 2024 14:30 |
| End Date |
Expired
28/03/2024
Expired 933 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(1) renewal of ordinary/ improved sej to twsej with psc sleepers (planned basis) - 191 sets & (2) renewal of sej-29 set and glued joint - 333 set.
(1) renewal of ordinary/ improved sej to twsej with psc sleepers (planned basis) - 191 sets & (2) renewal of sej-29 set and glued joint - 333 set.
Read moreConstruction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
Read moreConstruction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
Read moreBalance work for dumetra-rourkela steel plant connectivity-execution of earthwork in formation, construction of minor bridges, drains works, p. way linking works, supply of p. way fittings, transportation of p. way materials, supply of ballast, construction of goomties, approach road and other allied works.
Balance work for dumetra-rourkela steel plant connectivity-execution of earthwork in formation, construction of minor bridges, drains works, p. way linking works, supply of p. way fittings, transportation of p. way materials, supply of ballast, construction of goomties, approach road and other allied works.
Read moreManufacturing and supply of leaf spring to rdso drg. no. t-6310 (alteration nil) for slide chair for 10125 mm curved switch with zu-1-60 thick web tongue rails b.g. (1673 mm) for 60 kg (uic) on psc sleepers and conforming to specification 55 si-7 & irs: t-42-2020 (revision 01).
Manufacturing and supply of leaf spring to rdso drg. no. t-6310 (alteration nil) for slide chair for 10125 mm curved switch with zu-1-60 thick web tongue rails b.g. (1673 mm) for 60 kg (uic) on psc sleepers and conforming to specification 55 si-7 & irs: t-42-2020 (revision 01).
Read moreConstruction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica
Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read morePrice agreement for manufacture and supply of 1 in 16 tws turnout for 22.9t axle load for 11200 mm curved switch with 60e1a1 thick web tongue rails for 1 in 16 turnout b.g. (1673 mm) for 60e1 rail with r260 grade on psc sleepers (drawings and item details as mentioned in set document are applicable) drg: (rdso) rdso/t-10242 alt. nil spec: (rdso) irs/t-10-2025 set doc: set_rt_10242_ alt_nil
Price agreement for manufacture and supply of 1 in 16 tws turnout for 22.9t axle load for 11200 mm curved switch with 60e1a1 thick web tongue rails for 1 in 16 turnout b.g. (1673 mm) for 60e1 rail with r260 grade on psc sleepers (drawings and item details as mentioned in set document are applicable) drg: (rdso) rdso/t-10242 alt. nil spec: (rdso) irs/t-10-2025 set doc: set_rt_10242_ alt_nil
Read moreof your Industry type