Tender Details
Particulars | Details |
---|---|
Title |
Rampura Dhillon Laying Of Rcc Pipe Line For Waiste Water At Village Rampura Dhillon From H/O Dhata Ram To H/O Ranjeet Kaswan, H/O Ranjeet Kaswan, To H/O Shastri Master, H/O Shastri Master To Pond (Hgvy)
|
Description |
Rampura Dhillon Laying Of Rcc Pipe Line For Waiste Water At Village Rampura Dhillon From H/O Dhata Ram To H/O Ranjeet Kaswan, H/O Ranjeet Kaswan, To H/O Shastri Master, H/O Shastri Master To Pond (Hgvy)
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_318746_1 |
Reference Number |
20234A921EEB AF4D 4028 9FDA DED0B81DFA1D706DEV |
Tender Fee | 1000 |
EMD | 62809 |
Tender Value | |
Place | Executive Engineer Sirsa |
Link | https://etenders.hry.nic.in |
Start Date | October 09, 2023 14:30 |
End Date |
16/10/2023 ( Expired 581 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Spl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Spl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Read moreShifting of pipeline from new road alignment by pmgsy at nh208a (ananda bazar) to dt road of jubarajnagar block of dws sub-division panisagar 2024-25/sh- laying of upvc pipe line and other allied works attached to dtw/innovative schemes (2nd call)
Shifting of pipeline from new road alignment by pmgsy at nh208a (ananda bazar) to dt road of jubarajnagar block of dws sub-division panisagar 2024-25/sh- laying of upvc pipe line and other allied works attached to dtw/innovative schemes (2nd call)
Read moreConstruction of rain water collection sump, injection borewell for ground water recharge, laying of 900mm and 600mm dia rcc nhp4 storm water pipe line, laying of precast concrete blocks, construction of compound wall with see through railing and gates at hmda grounds, ntr marg
Construction of rain water collection sump, injection borewell for ground water recharge, laying of 900mm and 600mm dia r.c.c np4 storm water pipe line, laying of precast concrete blocks, construction of compound wall with see through railing and gates at hmda grounds, ntr marg
Read moreConstruction of rcc , brick masonry drain for diversion of waste water at municipal dangal pukur to save the water from any type of contamination , for the interest of public of suri at ward no.-8, mouza-chandnisahebganj ,j.l. no.-7 , plot no.- 108
Construction of rcc , brick masonry drain for diversion of waste water at municipal dangal pukur to save the water from any type of contamination , for the interest of public of suri at ward no.-8, mouza-chandnisahebganj ,j.l. no.-7 , plot no.- 10
Read more11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
Read moreLaying work of water pipe line 280m dia150mm di k7 from nati imli oht gate via nati imli chauraha to bharat milap colony mode near bank of baroda dhoopchandi ward in jaitpura
Laying work of water pipe line 280m dia150mm di k7 from nati imli oht gate via nati imli chauraha to bharat milap colony mode near bank of baroda dhoopchandi ward in jaitpura
Read moreInstallation of another motorpump at pond near excavation workshop laying 800 mtrs. dwchdpe 90 mm dia pipe od 90 mm n id 76 mm nominal to provide water to coal stock to blow out fire caught in coal on urgent basis at tapin north ocp hzb area
Installation of another motor pump at pond near excavation workshop laying 800 mtrs. dwchdpe 90 mm dia pipe od 90 mm n id 76 mm nominal to provide water to coal stock to blow out fire caught in coal on urgent basis at tapin northocphzb area
Read moreLaying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area
Laying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area
Read moreLaying of distribution line chotto mechhua village to bara mechhua village parallel 63 mm od upvc pipe under augmentation of barasukjora pond based piped water supply scheme zone-i in binpur-ii block within jhargram division under jhargram divis
Laying of distribution line chotto mechhua village to bara mechhua village parallel 63 mm od upvc pipe under augmentation of barasukjora pond based piped water supply scheme zone-i in binpur-ii block within jhargram division under jhargram divis
Read moreLaying of di pipe from bhainsa to wtp in connection to the work augmentation of water supply system along with ancillary work for patnagarh town under amrut 2.0
Laying of di pipe from bhainsa to wtp in connection to the work augmentation of water supply system along with ancillary work for patnagarh town under amrut 2.0
Read moreof your Industry type