Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 1 No. Deputy Ranger Quarter Tower At Bamunigaon Of Bamunigaon Range, Under Campa Apo 2023 24
|
Description |
Construction Of 1 No. Deputy Ranger Quarter Tower At Bamunigaon Of Bamunigaon Range, Under Campa Apo 2023 24
|
Organisation | Government of Assam |
Tender Id | 2023_PCCF_33581_1 |
Reference Number |
CAMPA APO 23-24/Building/Dy.Ranger Qtr/4766 |
Tender Fee | 1000 |
EMD | 74561 |
Tender Value | |
Place | O/o The DFO, KAMRUP WEST DIVISION |
Link | https://assamtenders.gov.in |
Start Date | November 14, 2023 19:30 |
End Date |
29/11/2023 ( Expired 532 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreCa no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreLining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreConstruction of type d (non mil) echs polyclinic bldg at koirengei, imphal under ge 869 ews leimakhong.
Construction of type d (non mil) echs 
 polyclinic bldg at koirengei, imphal under ge
 869 ews leimakhong.
Read moreService contract for replacement of condenser tubes in any one unit at ktps under additional capex 24-25
Service contract for replacement of condenser tubes in any one unit at ktps under additional capex 24-25
Read moreof your Industry type