Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Special Maintenance Repair Works At 76 Tngrhs Flats
|
| Description |
Providing Special Maintenance Repair Works To Flat No B01 B02 B03 B06 B08 B09 B13 B15 B17 B18 B19 B22 B23 B24 B27 B28 B29 B30 B31 B38 A01 A10 A11 A13 A19 A23 A28 A30 A31 A35 And A38 At 76 Tngrhs Taylors Road Kilpauk Chennai 10
|
| Organisation | Tamil Nadu Housing Board | State Govt. and UT |
| Tender Id | 2024_TNHB_495726_1 |
|
Reference Number |
TNHB_SPDI_010_24-25 |
| Tender Fee | 0 |
| EMD | 4010 |
| Tender Value | - |
| Place | Taylors road Kilpauk |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=589018 |
| Start Date | October 23, 2024 20:30 |
| End Date |
Expired
06/11/2024
Expired 689 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreDesign, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreRblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSpecial maintenance repair works at 76 tngrhs flats
Providing special maintenance repair works to flat no b30 at 76 tngrhs taylors road kilpauk chennai 10 for the year 2024 to 25
Read moreSpecial maintenance repair works at 76 tngrhs flats
Providing special maintenance repair works to flat no a29 a23 a28 a31 a35 a38 b3 b17 b22 b23 b24 b29 b37 and b38 at 76 tngrhs taylors road kilpauk chennai 10 for the year of 2024 to 25
Read moreof your Industry type