Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Lhs Installation For Safety 🛡️ The Ministry Of Railways, Under The Central Government, Invites Bids For The Provision Of Left Hand Side (Lhs) At Kilometer 36/7 8 Between Patr Rusd Station In The Smi Section, Aimed At Preventing Train Trespassing Incidents. 🚧 📅 Bid Submission Deadline: May 03, 2024, 12:00 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 3,40,600. 💰 Detailed Tender Documents Must Be Consulted For Comprehensive Project Specifications And Requirements. Keywords: Lhs Installation, Safety Measures, Ministry Of Railways, Tender, Train Trespassing, Central Government Procurement, Earnest Money Deposit| Particulars | Details |
|---|---|
| Title |
Provision Of Lhs At Km 36/7 8 Between Patr Rusd Station In Mfp Smi Section To Pr Trespassing.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74543410 |
|
Reference Number |
TC-35-2024-SPJ |
| Tender Fee | 0 |
| EMD | 3.41 Lakh |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74543410/viewNitPdf_4532426.pdf |
| Start Date | April 10, 2024 18:39 |
| End Date |
Expired
03/05/2024
Expired 897 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ohe modification work due to construction of 5 no. lhs between orw - msw section and 5 no. lhs between gkp- orw section (total 10 no. lhs) in lucknow division of n.e. railway.
Ohe modification work due to construction of 5 no. lhs between orw - msw section and 5 no. lhs between gkp- orw section (total 10 no. lhs) in lucknow division of n.e. railway.
Read moreVythiri gp-pr no. 36-2026-27 pulkunnu chelode road maintenanace .
Vythiri gp-pr no. 36-2026-27 pulkunnu chelode road maintenanace .
Read moreProvision of covering shed on lhs no. 32a and improvement surfaces, joint sealing, drainage and strengthening on lhs no. 32a, 38b on rpj-dui section.
Provision of covering shed on lhs no. 32a and improvement surfaces, joint sealing, drainage and strengthening on lhs no. 32a, 38b on rpj-dui section.
Read more(a) rajkot division - providing lhs in lieu of lc no. 92 at km 698/1-2 between lxr-wkr (b) rajkot division: provision of rub/lhs at lc no 26 (km 604/0-1), 33 (km 616/8-9), 41 (km 632/3-4), 42(633/9-634/0), 49 (km640/2-3) (c ) rajkot division:-viramgam -okha: - provision of rub/lhs at lc no 25 at km 602/9-603/0, (d) rajkot division: provision of rub/lhs at lc no 61 (km 657/4-5), 65 (km 663/2-3),66(664/5-6), 80(km 687/2-3), 81 (km 688/7-8), (e) rajkot division: provision of rub/lhs at lc
(a) rajkot division - providing lhs in lieu of lc no. 92 at km 698/1-2 between lxr-wkr (b) rajkot division: provision of rub/lhs at lc no 26 (km 604/0-1), 33 (km 616/8-9), 41 (km 632/3-4), 42(633/9-634/0), 49 (km640/2-3) (c ) rajkot division:-viramgam -okha: - provision of rub/lhs at lc no 25 at km 602/9-603/0, (d) rajkot division: provision of rub/lhs at lc no 61 (km 657/4-5), 65 (km 663/2-3),66(664/5-6), 80(km 687/2-3), 81 (km 688/7-8), (e) rajkot division: provision of rub/lhs at lc
Read moreProvision of precast rcc boundary wall between billochpura -bad (ex) section. (12 running km)
Provision of precast rcc boundary wall between billochpura -bad (ex) section. (12 running km)
Read moreProvision of l.h.s. of size 3.00m x 2.50m in lieu of trespassing location at km 39/3-4 in bat yard on asr-ptk section under aden-i/asr.
Provision of l.h.s. of size 3.00m x 2.50m in lieu of trespassing location at km 39/3-4 in bat yard on asr-ptk section under aden-i/asr.
Read moreProvision of ibh at lohapur (lap) station in between takipur (tkp) & moregram (mgae) station and provision of ibh at barala (baa) station in between sagardighi (sdi) & gossain gram (gsgb) station of hwh division
Provision of ibh at lohapur (lap) station in between takipur (tkp) & moregram (mgae) station and provision of ibh at barala (baa) station in between sagardighi (sdi) & gossain gram (gsgb) station of hwh division
Read moreSlope stabilization work between 9/0 to 10/0 and 33/0 to 36/0 on nh-58e
Slope stabilization work between 9/0 to 10/0 and 33/0 to 36/0 on nh-58e
Read moreCbh-dsme: - provision of lhs for elimination of trespass at maskedi at km.358/28-359/2 between cbh-dsme and construction of the same in 3rd & 4th line portion in connection with construction of 3rd & 4th rail line between gomoh to koderma section under son nagar to andal rail line project.
Cbh-dsme: - provision of lhs for elimination of trespass at maskedi at km.358/28-359/2 between cbh-dsme and construction of the same in 3rd & 4th line portion in connection with construction of 3rd & 4th rail line between gomoh to koderma section under son nagar to andal rail line project.
Read moreof your Industry type