Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 11 Kv Line Towards Shifting Of Existing Line Form Ch. 1.200 To Ch.2.300 For Improvement And Widening Of Existing Double Lane Road From Bio Technology Farm To Proposed Narseemonjee Institute Of Management Ch.0.000 To 3.332 Km
|
Description |
Construction Of 11 Kv Line Towards Shifting Of Existing Line Form Ch. 1.200 To Ch.2.300 For Improvement And Widening Of Existing Double Lane Road From Bio Technology Farm To Proposed Narseemonjee Institute Of Management Ch.0.000 To 3.332 Km
|
Organisation | EIC-CIVIL | State Govt. and UT |
Tender Id | 2024_EICCL_108785_1 |
Reference Number |
TENDER CALL NOTICE NO.13 OF 2024-25 |
Tender Fee | 6000 |
EMD | 21580 |
Tender Value | |
Place | Bhubaneswar |
Link | https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=528172 |
Start Date | February 01, 2025 21:30 |
End Date |
14/02/2025 ( Expired 136 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreWidening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreShifting/di of existing utilities such as sewer line, water pipelines, storm /surface drain, etc. along the proposed delhi- gurugram- snb namo bharat corridor from dharuhera (govt. school) to snb (shahajahanpur - neemrana -behror)
Shifting/di of existing utilities such as sewer line, water pipelines, storm /surface drain, etc. along the proposed delhi- gurugram- snb namo bharat corridor from dharuhera (govt. school) to snb (shahajahanpur - neemrana -behror)
Read moreShifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160
Shifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreof your Industry type