Tender Details
Particulars | Details |
---|---|
Title |
Internal Clearance Such As ...
|
Description |
Titram Link Drain Originate From The Pond Of Village Titram And Falls Under The Jurisdiction Of Jakholi W.S. Division Kaithal. This Drain Carries The Discharge Of 50 Cs And It Is Major Channel For Disposal Of Flood/Off Water From Catchment Area
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_373944_1 |
Reference Number |
202440A08892 A8F2 4BA1 8DC3 E111DBF3EF60112IRR |
Tender Fee | 1680 |
EMD | 4091 |
Tender Value | |
Place | TITRAM |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=449871 |
Start Date | June 07, 2024 15:30 |
End Date |
12/06/2024 ( Expired 352 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreBio medical waste management service - per bed basis - as per scope of work; district hospitals, as
Read more
Copper crucible of 350 mm dia. and 3640 mm length for var melting as per drawing- d-4116-03-009a,28
Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreof your Industry type