Tender Details
Particulars | Details |
---|---|
Title |
1. Supply Of" Omega 77 Lubricating Grease" In Original Standard Sealed Packing. (Pack Size: 5 Kg),2
|
Description |
|
Organisation | Department of Atomic Energy | PMO |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 10, 2025 18:59 |
End Date |
03/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and constr of hardened amn bunker 5 mt in 2 mtn div aor
Supply and constr of hardened amn bunker 5 mt in 2 mtn div aor
Read moreSupply of m.s. e.r.w black and plain ended m.s. casing pipe as per is 4270 (01) in random length of 04 m to 7m or 6m in following dia. size 175mm x 5.4mm thick file no. 167/25x9/1
Supply of m.s. e.r.w black and plain ended m.s. casing pipe as per is 4270 (01) in random length of 04 m to 7m or 6m in following dia. size 175mm x 5.4mm thick file no. 167/25x9/1
Read more1. supply of" omega 77 lubricating grease" in original standard sealed packing. (pack size: 5 kg),2
Read more
Construction work of 5 seater public toilet and 2 urinals near chhibramau bus stop/intersection in ward no. 1 and 3 harshnagar/indaranagar.
Construction work of 5 seater public toilet and 2 urinals near chhibramau bus stop/intersection in ward no. 1 and 3 harshnagar/indaranagar.
Read moreConstruction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 of anchor 1 to anchor 2 and anc 2 to saddle 3 between anchor 2 and 3 of power house vi penstock
Construction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 of anchor 1 to anchor 2 and anc 2 to saddle 3 between anchor 2 and 3 of power house vi penstock
Read moreConstruction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs
Construction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs
Read moreConstruction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Read moreSupply of man power to seven major temples, i.e, 1) sri varaha lakshmi narasimha swamy devasthanam, simhachalam, visakhapatnam district 2) sri veera venkata satyanarayana swamy temple, annavaram, kakinada district 3) sri venkateswara swamy temple, dwaraka tirumala, eluru district 4) sri durga malleswara swamyvarla devasthanam, vijayawada, ntr district 5) sri kalahasteeswara swamy devasthanam, srikalahasti, tirupati district 6) sri swayambu sri varasiddi vinayaka swamy devasthanam, kanipakam (v),
Supply of man power to seven major temples, i.e, 1) sri varaha lakshmi narasimha swamy devasthanam, simhachalam, visakhapatnam district 2) sri veera venkata satyanarayana swamy temple, annavaram, kakinada district 3) sri venkateswara swamy temple, dwaraka tirumala, eluru district 4) sri durga malleswara swamyvarla devasthanam, vijayawada, ntr district 5) sri kalahasteeswara swamy devasthanam, srikalahasti, tirupati district 6) sri swayambu sri varasiddi vinayaka swamy devasthanam, kanipakam (v), irala (m), chittoor district 7) sri bhramaramba mallikarjuna swamy vari devasthanam, srisailam, nandyal districtfor two years period.
Read moreConstruction of new buildings for 1) sw pre metric girls hostel at gudur (vm), 2) sw pre metric boys hostel at kambalapadu (v) of krishnagiri (m) in kurnool district, 3) sw pre metric girls hostel at kanekal (vm) in ananthapuram district, 4) sw post metric boys hostel at navaz katta in atmakur town, 5) sw post metric girls hostel at kg road, nandikotkuru town in nandyala district as package-iv under pm ajay (5 nos)-esti.rs.1500.00 lakhs
Construction of new buildings for 1) sw pre metric girls hostel at gudur (vm), 2) sw pre metric boys hostel at kambalapadu (v) of krishnagiri (m) in kurnool district, 3) sw pre metric girls hostel at kanekal (vm) in ananthapuram district, 4) sw post metric boys hostel at navaz katta in atmakur town, 5) sw post metric girls hostel at kg road, nandikotkuru town in nandyala district as package-iv under pm ajay (5 nos)-esti.rs.1500.00 lakhs
Read moreImprovement of road from kuppam-modaiyur road km 0/0-1/210 with 5 years routine maintenance in chetpet block of tiruvannamalai district tvm/2025-26/77 under nabard ridf 2025-2026
Improvement of road from kuppam-modaiyur road km 0/0-1/210 with 5 years routine maintenance in chetpet block of tiruvannamalai district tvm/2025-26/77 under nabard ridf 2025-2026
Read moreof your Industry type