Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Pazhassi Irrigation Project Py Ip Rectification Work To Damaged Ut And Foot Bridge Near Ch 14 900 Km And Construction Of Leading Channel To The Ut Near Ch 15 500 Km At Pattiyam In Mahe Branch Canal For The Year 2023 24 General Civil Work
|
| Description |
General Pazhassi Irrigation Project Py Ip Rectification Work To Damaged Ut And Foot Bridge Near Ch 14 900 Km And Construction Of Leading Channel To The Ut Near Ch 15 500 Km At Pattiyam In Mahe Branch Canal For The Year 2023 24 General Civil Work
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_623201_2 |
|
Reference Number |
IRR/PI/TR/4268/2022_5_1_1/1 |
| Tender Fee | 2760 |
| EMD | 36434 |
| Tender Value | - |
| Place | Office of the Executive Engineer PyIP Division |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | December 04, 2023 23:30 |
| End Date |
Expired
13/12/2023
Expired 1036 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General budget rectification work urgent leak rectification works of flume in oyoor distributary between ch 450 m 500 m and ch 800 m 900 m in pooyappally grama panchayath general civil work
General budget rectification work urgent leak rectification works of flume in oyoor distributary between ch 450 m 500 m and ch 800 m 900 m in pooyappally grama panchayath general civil work
Read moreGeneral-deposit work -2026-27-rectification of damaged tractor crossing slab and side wall of ch 0/960 to ch 0/966 km of kambrathchalla branch canal and construction of side protection wall in cada field channel of ch 0/367 to ch 0/388 km that off
Clearing grass demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 cc 1_1 5_3 centering and shuttering plastering etc
Read moreGeneral pazhassi irrigation project pyip rectification work to damaged ut and foot bridge near ch 14 900 km and construction of leading channel to the ut near ch 15 500 km at pattiyam in mahe branch canal for the year 2023 24 general civil work
General pazhassi irrigation project pyip rectification work to damaged ut and foot bridge near ch 14 900 km and construction of leading channel to the ut near ch 15 500 km at pattiyam in mahe branch canal for the year 2023 24 general civil work
Read morePyip _ rectification work of cut and cover at ch _ 10_400 km at purakkalam of mahe branch canal for the year 2024_25
Pyip _ rectification work of cut and cover at ch _ 10_400 km at purakkalam of mahe branch canal for the year 2024_25
Read moreGeneral main canal pyip construction of wingwall and leading channel at d s of
General main canal pyip construction of wingwall and leading channel at d s of super passage of main canal near ch 11 050km at kara for the year 2023 24 general civil work
Read morePyip _desiltation of ut at ch _18/500km of mahe branch canal at makkool peedika for the year 2023_24
Pyip _desiltation of ut at ch _18/500km of mahe branch canal at makkool peedika for the year 2023_24
Read moreNabard-cpp-nurnee system -2023-24- rectification of culvert of surplus leading channel of nurnee main canal ch 3/569km and ch 6/260km and repairs to toe wall and strengthening of leading channel of nurnee main canal near ch 3/569 km-general civil
Demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 cc 1_1 5_3 centering and shuttering platering etc
Read moreState plan 2023 24 wtp leading channel interconnection of leading channel and rectification of leakages at 45 mld wtp mevelloor pipeline work rewamping job
State plan 2023 24 wtp leading channel interconnection of leading channel and rectification of leakages at 45 mld wtp mevelloor pipeline work rewamping job
Read morePyip rectification work to canal flume of kurumbukkal fb of mahe branch canal at ch_ 0_010km and at ch_0_508 km for the year 2023_24
Pyip rectification work to canal flume of kurumbukkal fb of mahe branch canal at ch_ 0_010km and at ch_0_508 km for the year 2023_24
Read moreGeneral mahe branch canal pyip clearing jungle in mahe branch canal between ch 0.000 km and 16.600 km and 19.700 km and 23.034 km for the year 2023. 24 general civil work
General mahe branch canal pyip clearing jungle in mahe branch canal between ch 0.000 km and 16.600 km and 19.700 km and 23.034 km for the year 2023. 24 general civil work
Read moreof your Industry type