Tender Details

Particulars Details
Title
Provision Of Safety Fencing Under Sse/P Way (Ml/Pune) On Lnl Pa Section Under Aden(s)lnl.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78004437
Reference
Number
DRM-W-PA-E-Tnd-2024-CO-29
Tender Fee 0
EMD 17.37 Lakh
Tender Value
Place Mumbai CST
Link https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78004437/viewNitPdf_4745614.pdf
Start Date October 24, 2024 22:19
End Date

19/11/2024 ( Expired 154 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor

Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor

Read more
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode

Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode

Read more
Slope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode

Slope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
4lane with paved shoulders from km0.00 ranganathpura (hassan) to km 76.16 (keresooragondanahalli) in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o)

4lane with paved shoulders from km0.00 ranganathpura (hassan) to km 76.16 (keresooragondanahalli) in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o)

Read more
Internal improvement works of section no. s-408 (package-6) for water supply scheme 1. chak modi khera urf chak radheywala, block abohar, distt. fazilka (under nabard xxvii/jjm)

Internal improvement works of section no. s-408 (package-6) for water supply scheme 1. chak modi khera urf chak radheywala, block abohar, distt. fazilka (under nabard xxvii/jjm)

Read more
Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.

Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.

Read more
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Leakage and seepage at qtr no 10/4 66/01 67/01 and 67/03 including construction of roof on main door entrance of qtr no 66/01 and 66/02 of mt platoon estt no.22 through mes dehradun under ge (p) dehradun

Leakage and seepage at qtr no 10/4 66/01 67/01 and 67/03 including construction of roof on main door entrance of qtr no 66/01 and 66/02 of mt platoon estt no.22 through mes dehradun under ge (p) dehradun

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise