Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of W.B.M Service Road In Between 0.00 Km To 56.04 Km Of Grmc.
|
| Description |
Construction Of W.B.M Service Road In Between 0.00 Km To 56.04 Km Of Grmc.
|
| Organisation | WRD EinC Major-Med n Minor | State Govt. and UT |
| Tender Id | 2024_WRD_88289_1 |
|
Reference Number |
WRD/IRRDIVGALUDIH/SBD-01/24-25 |
| Tender Fee | 10000 |
| EMD | 17.21 Lakh |
| Tender Value | |
| Place | Musabani |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=118967 |
| Start Date | July 16, 2024 18:30 |
| End Date |
Expired
05/08/2024
Expired 678 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreGeneral budget 2024.25 20percentage concreate pavement construction at kailasam pendaanampadi road between km. 0.000 to 0.755
General budget 2024.25 20percentage concreate pavement construction at kailasam pendaanampadi road between km. 0.000 to 0.755
Read moreRejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Read moreSupply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Read moreImprovement to nallah/waterway from shree siddeshwar temple to the fields from ch.0.00 km to ch.1.50 km at paliem in v.p. ucassaim paliem punola in aldona constituency.
Improvement to nallah/waterway from shree siddeshwar temple to the fields from ch.0.00 km to ch.1.50 km at paliem in v.p. ucassaim paliem punola in aldona constituency.
Read moreDevelopment and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Development and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Read moreConstruction of chebri to nagalani road km 0.000 to 3.000 hp09830
Construction of chebri to nagalani road km 0.000 to 3.000 hp09830
Read morePermanent restoration on dhareja link road in km 1st by way of construction of drain
Permanent restoration on dhareja link road in km 1st by way of construction of drain
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreof your Industry type