Tender Details

Particulars Details
Title
Proposed Construction Of Compound Wall And Womens Open Gym At Osr 1 (564 Sqm) At Tnuhdb Aynambakkam Main Road In Div 86, Unit 19, Zone 7
Description
Proposed Construction Of Compound Wall And Womens Open Gym At Osr 1 (564 Sqm) At Tnuhdb Aynambakkam Main Road In Div 86, Unit 19, Zone 7
Organisation Corporation of Chennai | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 30000
Tender Value
Place CHENNAI
Link

AAAAAAAAAA

Login to view
Start Date June 11, 2025 23:30
End Date

23/06/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6

Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Read more
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Read more
Construction of central prison, 113 nos. of prison staff quarters, cement concrete road and security perimeter wall (for men prison) at therkkutheru utkadai sembur village, melur taluk in madurai district (phase-i)

Construction of central prison, 113 nos. of prison staff quarters, cement concrete road and security perimeter wall (for men prison) at therkkutheru utkadai sembur village, melur taluk in madurai district (phase-i)

Read more
Zone no. 04, ward no. 45, construction of boundary wall of kabristan located at kuthuliya on govindgarh main road.

Zone no. 04, ward no. 45, construction of boundary wall of kabristan located at kuthuliya on govindgarh main road.

Read more
Zone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.

Zone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Construction of 5.4 km long open main and lateral drains with cd works from rd 96.400 of igmc to rd 149 of gdc with construction of drainage siphon to remove drainage congestion in zone-ii (p-353)

Construction of 5.4 km long open main and lateral drains with cd works from rd 96.400 of igmc to rd 149 of gdc with construction of drainage siphon to remove drainage congestion in zone-ii (p-353)

Read more
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc

Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&amp#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise