Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏞️ Procurement Bid: Path Up Gradation At Nuwan Base Camp For Yatra 2024 🛠️ The Shri Amarnathji Shrine Board, In Collaboration With State Govt. And Ut, Is Seeking Bids For The Up Gradation Of Paths Within The (A Block) Tentage Area At Nuwan Base Camp For The Yatra 2024. 🚶♂️ 📅 Bid Submission Deadline: April 24, 2024, 2:00 Pm Tender Fee: Inr 800 Emd: Inr 12,000 Interested Contractors Are Required To Submit Detailed Proposals For The Supply And Installation Of Pre Cast Cement Concrete Tiles (Paver Blocks) To Enhance The Pathways, Ensuring Durability And Safety For The Pilgrims. Keywords: Path Up Gradation, Pre Cast Cement Concrete Tiles, Shri Amarnathji Shrine Board, Yatra 2024, State Govt. And Ut, Tender, Bid, Pilgrimage Infrastructure| Particulars | Details |
|---|---|
| Title |
Up Gradation To Paths At (A Block) Tentage Area By Way Of Providing Of Pre Cast Cement Concrete Tiles (Paver Blocks) At Nuwan Base Camp For Yatra 2024.
|
| Description |
Up Gradation To Paths At (A Block) Tentage Area By Way Of Providing Of Pre Cast Cement Concrete Tiles (Paver Blocks) At Nuwan Base Camp For Yatra 2024.
|
| Organisation | Shri Amarnathji Shrine Board | State Govt. and UT |
| Tender Id | 2024_SASB_247850_3 |
|
Reference Number |
SASB/eNIT/2024/10 |
| Tender Fee | 800 |
| EMD | 12000 |
| Tender Value | - |
| Place | Pahalgam Axis |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=723034 |
| Start Date | April 04, 2024 14:30 |
| End Date |
Expired
24/04/2024
Expired 900 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing of pre cast tiles (paver blocks) for paths at b bock tentage area inside nunwan camp for yatr -2025.
Providing of pre cast tiles (paver blocks) for paths at b bock tentage area inside nunwan camp for yatr -2025.
Read moreYatra base camp complex sungli bhadarwah
Yatra base camp complex sungli bhadarwah. comprising of reception cum amenity centre main building, pilgrim lodge building and lavatory block&#x0d
Read moreI. yatra base camp complex sungli bhadarwah. (as is where is basis)
I. yatra base camp complex sungli bhadarwah. (as is where is basis)
Read moreProviding water supply facilities to shri amarnath ji yatra at base camp walnut factory levdora during yatra 2025-26
Providing water supply facilities to shri amarnath ji yatra at base camp walnut factory levdora during yatra 2025-26
Read moreConstruction of temporary sheds on the eve of sh. amarnath yatra ji yatra 2024 at base camp, bhagwati nagar , jammu.
Construction of temporary sheds on the eve of sh. amarnath yatra ji yatra 2024 at base camp, bhagwati nagar , jammu.
Read moreConstruction of temporary sheds on the eve of sh. amarnath yatra ji yatra 2024 at base camp, bhagwati nagar , jammu.
Construction of temporary sheds on the eve of sh. amarnath yatra ji yatra 2024 at base camp, bhagwati nagar , jammu.
Read moreConstruction of water proof hangers on the eve of sh. amarnath yatra ji yatra 2025 at base camp, bhagwatinagar , jammu.
Construction of water proof hangers on the eve of sh. amarnath yatra ji yatra 2025 at base camp, bhagwatinagar , jammu.
Read moreInstallation testing commissioning of 200 250watt led lights on 12.5 mtr long gi high mast tower at nuwan base camp and chandanwari for shri amarnath ji yatra 2023 including to and fro carriage of led lights
Installation testing commissioning of 200 250watt led lights on 12.5 mtr long gi high mast tower at nuwan base camp and chandanwari for shri amarnath ji yatra 2023 including to and fro carriage of led lights
Read moreImprovement of lt network at yatra base camp walnut factory qazigund and at yatra base camp mirbazar for sanjay - 2025 by way of laying of l t network in fci godown area and stabilization of l t network on the bank of nh 44 to facilitate safe parking
Improvement of lt network at yatra base camp walnut factory qazigund and at yatra base camp mirbazar for sanjay - 2025 by way of laying of l t network in fci godown area and stabilization of l t network on the bank of nh 44 to facilitate safe parking
Read moreRepairs and renovation of pdd departmental hut used as yatra base camp during sanjy at pahalagam
Repairs and renovation of pdd departmental hut used as yatra base camp during sanjy at pahalagam
Read moreof your Industry type