Tender Details
Particulars | Details |
---|---|
Title |
M/O Road (Corridor Improvement Of Udyog Marg From Dsc Road To Sector 11 T Point As A Model Road), Noida
|
Description |
M/O Road (Corridor Improvement Of Udyog Marg From Dsc Road To Sector 11 T Point As A Model Road), Noida
|
Organisation | New Okla Industrial Development Authority | State Govt. and UT |
Tender Id | 2025_NOIDA_1031072_1 |
Reference Number |
02/ET/DGM/SM/WC-1/2024-25 |
Tender Fee | 8260 |
EMD | 51 Lakh |
Tender Value | |
Place | Noida |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1864951 |
Start Date | April 22, 2025 21:15 |
End Date |
29/04/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreO and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
O and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
Read moreConstruction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreIndependent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreCs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call
Cs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call
Read moreof your Industry type