Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔌 Procurement Opportunity: 415 V Lt Power Distribution Panels 🏭 The Department Of Heavy Industry, Under The Ministry Of Heavy Industries And Public Enterprises, Is Seeking Bids For The Supply Of 415 V Lt Power Distribution Panels, Both Floor Mounted Types 1 And 2. 🗓️ Bid Submission Deadline: April 15, 2024, 4:00 Pm Interested Bidders Are Requested To Submit Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Project's Requirements. Keywords: 415 V Lt Power Distribution Panels, Procurement, Department Of Heavy Industry, Ministry Of Heavy Industries And Public Enterprises, Electrical Equipment, Bid Submission| Particulars | Details |
|---|---|
| Title |
415 V Lt Power Distribution Panel 1 (Floor Mounting),415 V Lt Power Distribution Panel 2 (Floor Mount
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2024/B/4841893 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 05, 2024 21:31 |
| End Date |
Expired
15/04/2024
Expired 886 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
POWERFORCE CORPORATION
447200
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | BRILLTECH ENGINEERS PRIVATE LIMITED | Make : BRILLTECH Model : 33KV_SOLUTION_BRILLTECH Title : 33KV HT Panels, LT Breakers and distribution Transformers at Substation | 11-04-2024 16:06:15 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 2 | Expert Engineers | Make : EXPERT ENGINERS Model : EXPERT Title : DISTRIBUTION PANEL | 15-04-2024 12:41:12 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 3 | M/S D.P. ELECTRICALS | Make : D.P. ELECTRICALS Model : D.P. ELECTRICALS Title : 415V LT POWER DISTRIBUTION PANEL-1 (FLOOR MOUNTING) | 14-04-2024 09:55:12 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 4 | PARAM CONTROLS | Make : Param Controls Model : PROCUREMENT OF LT PANEL BOARD Title : PROCUREMENT OF LT PANEL BOARD | 15-04-2024 13:05:31 | Registered with designated Agency / Authority | MII N/A | Disqualified |
| 5 | POWERFORCE CORPORATION | Make : POWERFORCE CORPORATION Model : 415B/1250A 1IC 4OG Title : LT OUTDOOR PANEL BOARD, 415V, 3PH, 4WIRE | 13-04-2024 18:18:19 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 6 | S.S. POWER CONTROL | Make : SS POWER CONTROL Model : LT DIST PANEL Title : LT DIST PANEL | 11-04-2024 16:25:55 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 7 | SANHIT AUTOMATION TECHNOLOGIES PRIVATE LIMITED | Make : Sanhit Automation Technologies Pvt. Ltd. Model : 415V LT POWER DISTRIBUTION PANEL-1 (FLOOR MOUNTING Title : 415V LT POWER DISTRIBUTION PANEL-1 (FLOOR MOUNTING) | 15-04-2024 14:35:31 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 8 | SK Enterprise | Make : NA Model : SKE/LV/DB Title : Distribution Board | 13-04-2024 19:11:25 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 9 | SUPER ELMECH ENGINEERS PRIVATE LIMITED | Make : SUPER ELMECH ENGINEERS PVT. LTD. Model : SEEPL Title : 415V LT PANEL-1 | 15-04-2024 13:34:15 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 10 | TATVAMASI AUTOMATION PRIVATE LIMITED | Make : Tatvamasi Model : 415V LT POWER DISTRIBUTION PANEL Title : SCHNEIDER | 13-04-2024 14:52:51 | Start-up | MII MSE | Disqualified |
| 11 | Wisdom Techno Solutions | Make : wisdom Techno Solutions Model : 415V LT POWER DISTRIBUTION PANEL Title : 415V LT POWER DISTRIBUTION PANEL-1 (FLOOR MOUNTING) (Q3) , 415V LT POWER DISTRIBUTION PANEL-2 (FLOOR | 15-04-2024 15:32:53 | Registered with designated Agency / Authority | MII MSE | Qualified |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| LT OUTDOOR PANEL BOARD, 415V, 3PH, 4WIRE | POWERFORCE CORPORATION | 415B/1250A 1IC 4OG | 1 | ₹ 140000.000 |
| LT OUTDOOR PANEL BOARD, 415V, 3PH, 4WIRE | POWERFORCE CORPORATION | 415B/1250A 1IC 4OG | 1 | ₹ 212000.000 |
| LT OUTDOOR PANEL BOARD, 415V, 3PH, 4WIRE | POWERFORCE CORPORATION | 415B/1250A 1IC 4OG | 1 | ₹ 50000.000 |
| ICT charges for 415V LT POWER DISTRIBUTION PANEL-1 (FLOOR MOUNTING) | NA | ICT | 1 | ₹ 14000.000 |
| ICT charges for 415V LT POWER DISTRIBUTION PANEL-2 (FLOOR MOUNTING) | NA | ICT | 1 | ₹ 21200.000 |
| ICT charges for 415V LT POWER DISTRIBUTION PANEL-3 (WALL MOUNTING) | NA | ICT | 1 | ₹ 10000.000 |
Construction of patancheru town section office in ground floor and ade lines in first floor in the premises of 33/11 kv indoor substation of patancheru mpdo office in patancheru division of sangareddy circle.
Construction of patancheru town section office in ground floor and ade lines in first floor in the premises of 33/11 kv indoor substation of patancheru mpdo office in patancheru division of sangareddy circle.
Read moreProposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Proposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Read moreEngaging of 02nos. back hoe loaders of engine capacity not less than 48hp for clearing of grid jams at wagon tippler 1 and 2, track hopper 1a and 1b grids and at contingency arrangement 1 and 2 on round the clock basis for arranging uninterrupted coal feeding for a period of one year from the actual date of commencement of work
Engaging of 02nos. back hoe loaders of engine capacity not less than 48hp for clearing of grid jams at wagon tippler 1 and 2, track hopper 1a and 1b grids and at contingency arrangement 1 and 2 on round the clock basis for arranging uninterrupted coal feeding for a period of one year from the actual date of commencement of work
Read moreof your Industry type