Particulars | Details |
---|---|
Title |
Rectification/Repairing Of Troughing/Top Idler Frame Of Reclaim Conveyor 3 C1, 3 C2, 4 C1, 4 C2 Including Complete Fitting (1400 Mm) And Scrap To Chp Store Section At Chp Phase I, Amlohri Project.
|
Description |
Rectification/Repairing Of Troughing/Top Idler Frame Of Reclaim Conveyor 3 C1, 3 C2, 4 C1, 4 C2 Including Complete Fitting (1400 Mm) And Scrap To Chp Store Section At Chp Phase I, Amlohri Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_335085_1 |
Reference Number |
AML/SO/ENM/ETN/25/633 |
Tender Fee | 0 |
EMD | 7000 |
Tender Value | |
Place | Amlohri Project, NCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347378 |
Start Date | May 10, 2025 14:30 |
End Date |
20/05/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of precast concrete main hole cover with frame as per is-12592-2002 extra heavy duty with center hole 100 mm dia in size including transportation work to central store thatipur, gwalior with loading and unloding and stacking complete. size 900
Supply of precast concrete main hole cover with frame as per is-12592-2002 extra heavy duty with center hole 100 mm dia in size including transportation work to central store thatipur, gwalior with loading and unloding and stacking complete. size 900
Read moreFabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Read moreRefurbishment of 2000kva rated,11kv/6.6 transformer and pumping station equipment duly repairing, reconditioning and replacement of spares to the 6.6kv ht panels also to provide mandatory spares the intake well raw water pumping station in kalabgoor under mwss phase i and phase ii under transmission division no.ii patancheru
Refurbishment of 2000kva rated, 11kv/6.6 transformer and pumping station equipment duly repairing, reconditioning and replacement of spares to the 6.6kv ht panels also to provide mandatory spares to the intake well raw water pumping station at kalabgoor under mwss phase-i and ii under transmission division no.ii, patancheru
Read moreComplete repairing and overhauling of a)popular shaft of 58 screen and coupling of 79 belt conveyor b)bearing block with bearing in take-up drum (left and right side) of unit no. 66 and 79 belt conveyor in raw coal section at kathara washery
Complete repairing and overhauling of a)popular shaft of 58 screen and coupling of 79 belt conveyor b)bearing block with bearing in take-up drum (left and right side) of unit no. 66 and 79 belt conveyor in raw coal section at kathara washery
Read moreRepairing and maintenance of eot (electric overhead travelling) crane of chp phase-ii crusher house at amlohri project.
Repairing and maintenance of eot (electric overhead travelling) crane of chp phase-ii crusher house at amlohri project.
Read moreAmtc water supply scheme rajgarh replacing of rcc np 2 pipe 400 mm i d and repair of inlet channel ho from dhirana minor to water works and taking out top layer to bottom layer filter media and rcc bed plates and replacing the same at filter bed n
Amtc water supply scheme rajgarh replacing of rcc np 2 pipe 400 mm i d and repair of inlet channel ho from dhirana minor to water works and taking out top layer to bottom layer filter media and rcc bed plates and replacing the same at filter bed n
Read moreRepairing of 01 no. sdn250 gear box installed in the reclaim section conveyor of chp phase-i at amlohri project.
Repairing of 01 no. sdn250 gear box installed in
 the reclaim section conveyor of chp phase-i at amlohri project.
Read moreCutting, dismantling, fitting and welding of new mother and liner plates to discharge chute of intermediate conveyor of stacker-i (1701) under chp/cpp, piparwar area.
Cutting, dismantling, fitting and welding of new mother and liner plates to discharge chute of intermediate conveyor of stacker-i (1701) under chp/cpp, piparwar area.
Read moreClubbed work (1) demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area,(2) cutting, dismantling, demounting, repairing, position
Clubbed work (1) demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area,(2) cutting, dismantling, demounting, repairing, position
Read moreMtps i 4x210mw m ii circle coal handling system first phase of initial revamping repair rectification works of chp entire conveyor system by procurement and erection of conveyor belts
Mtps i 4x210mw m ii circle coal handling system first phase of initial revamping repair rectification works of chp entire conveyor system by procurement and erection of conveyor belts