Tender Details
Particulars | Details |
---|---|
Title |
Rectification/Repairing Of Troughing/Top Idler Frame Of Reclaim Conveyor 3 C1, 3 C2, 4 C1, 4 C2 Including Complete Fitting (1400 Mm) And Scrap To Chp Store Section At Chp Phase I, Amlohri Project.
|
Description |
Rectification/Repairing Of Troughing/Top Idler Frame Of Reclaim Conveyor 3 C1, 3 C2, 4 C1, 4 C2 Including Complete Fitting (1400 Mm) And Scrap To Chp Store Section At Chp Phase I, Amlohri Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 7000 |
Tender Value | |
Place | Amlohri Project, NCL |
Link |
AAAAAAAAAA Login to view |
Start Date | May 10, 2025 14:30 |
End Date |
20/05/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification/repairing of troughing/top idler frame of reclaim conveyor 3c1, 3c2, 4c1, 4c2 including complete fitting (1400 mm) and scrap to chp store section at chp phase-i, amlohri project.
Rectification/repairing of troughing/top idler frame of reclaim conveyor 3c1, 3c2, 4c1, 4c2 including complete fitting (1400 mm) and scrap to chp store section at chp phase-i, amlohri project.
Read moreRemoval and replacement of damaged portion of 6/ 4/ 3 inches dia ms and gi pipe for firefighting and water supply at crushing and reclaim section of phase-i and ii chp dudhichua
Removal and replacement of damaged portion of 6/ 4/ 3 inches dia ms and gi pipe for firefighting and water supply at crushing and reclaim section of phase-i and ii chp dudhichua
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreDemounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area.
Demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area.
Read moreReplacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, rollers, fabrication and erection of same at 902-2 tail end side belt conveyor of ps-9 section at madhuban coal washe
Replacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, rollers, fabrication and erection of same at 902-2 tail end side belt conveyor of ps-9 section at madhuban coal washe
Read moreSupply and installation of electrical fitting of control panel board for loco dust blowing chamber consisting of four items (i) supply and fitment of mccb 100 amps 440v 3 phase make siemens / l&t (01 no.) (ii) supply and fitment of d.o.l starter amps range 85 to 105 amps 3 phase 440 v. (01 set.) (iii) supply and fitment of volts meter with rotary switch, size 96 x 96 mm 0-500 v, make- cosmo /ae (1 set.) (iv) single phase prawntal (1 no) with indicator & panel box.
For complete deion and other details, please refer to tender
Read moreSupply of 33 kv 3 phase highly insulated [supply of 33 kv 3 phase highly insulated frp telescopic earth discharge rod total section of each rod: 03 section assembled length 24ft. top section dia: 25mm, bottom section dia : 45 mm - earthing : cast alu. earthing instrument for 30mm dia cable 6 sq mm copper cable 6 mtr., make-technology, jaipuriya or similar, warranty-30 months.]
For complete deion and other details, please refer to tender
Read moreRepairing of head shaft assembly of gyratory crusher of chp phase-i at amlohri project
Repairing of head shaft assembly of gyratory crusher of chp phase-i at amlohri project
Read moreReplacement and repair of the troughing idler support of a 1400 mm belt conveyor for unit no. 404 a n 404 b under the raw coal section of the rajrappa washery project
Replacement and repair of the troughing idler support of a 1400 mm belt conveyor for unit no. 404 a n 404 b under the raw coal section of the rajrappa washery project
Read moreComplete dismantling, fabrication and fixing/erection of take-up pulley chequered floor area, side support structure ,take-up pulley frame, guide pipe/rails of conveyor 11c in amlohri chp phase-ii.
Complete dismantling, fabrication and fixing/erection
 of take-up pulley chequered floor area, side support
 structure ,take-up pulley frame, guide pipe/rails of
 conveyor 11c in amlohri chp phase-ii.
Read moreof your Industry type