Tender Details
Particulars | Details |
---|---|
Title |
Authority Engineer For Construction Of New 4 Lane Prayagraj Southern Bypass From Km. 43.200 Km. 50.860 (Near Nababa Urf Nibi Kala Uparhar) (Length 7.660 Km) Package 2 Under Phase I On Nh 19 In The State Of Up Under Bharatmala On Epc Mode
|
Description |
Authority Engineer For Construction Of New 4 Lane Prayagraj Southern Bypass From Km. 43.200 Km. 50.860 (Near Nababa Urf Nibi Kala Uparhar) (Length 7.660 Km) Package 2 Under Phase I On Nh 19 In The State Of Up Under Bharatmala On Epc Mode
|
Organisation | Central Public Procurement Portal 2 |
Tender Id | 2023_NHAI_162734_1 |
Reference Number |
NHAI/PIU-Prayagraj/ Pkg-II/AE/E-tender |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | 0 |
Place | NHAI HQ |
Link | https://etenders.gov.in |
Start Date | July 29, 2023 00:25 |
End Date |
14/09/2023 ( Expired 586 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana
Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreConstruction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreConstruction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh 33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode
Construction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreof your Industry type