Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Pre Monsoon Maintenance Works Of Various Overhead Lines 11 Kv 3 Point 3 Kv
|
| Description |
|
| Organisation | COAL INDIA LIMITED | Ministry of Coal |
| Tender Id | GEM/2025/B/6110356 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 05, 2025 23:21 |
| End Date |
Expired
16/04/2025
Expired 527 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreCustom bid for services - pre monsoon maintenance works of various overhead lines 11kv 3 point 3 kv
Read more
Custom bid for services - monsoon related maintenance work of various overhead lines 11kv 3 point 3
Read more
Maintenance of various ht/lt overhead lines 11kv, 3.3kv before and after monsoon at pocm.
Maintenance of various ht/lt overhead lines 11kv, 3.3kv before and after monsoon at pocm.
Read morePre-monsoon maintenance work of various overhead lines (11kv,3.3kv and 440v) under the administrative control of mungoli ocm,wani area.
Pre-monsoon maintenance work of various overhead lines (11kv,3.3kv and 440v) under the administrative control of mungoli ocm,wani area.
Read morePre monsoon maintenance of 6.6 kv tetulmari overhead feeders
For pre monsoon maintenance of 6.6 kv tetulmari overhead feeders originating from sbrs to tetulmari 7/8 substation with mudidih colliery as branch line as per preventive monsoon preparation 2023,under sijua
Read morePre-monsoon maintenance of 6.6 kv basdeopur overhead feeders originating
For pre-monsoon maintenance of 6.6 kv basdeopur overhead feeders originating from sbrs to basdeopur colliery with ocp mine mine substation as branch line as per preventive monsoon preparation 2023.
Read moreFor pre monsoon maintenance and repairing of 3.3 kv overhead line
For pre monsoon maintenance and repairing of 3.3 kv overhead line from(a) tocp substation to tocp mine and beldariya site and beldariya basti (b) 7/8 substation to pst-2 ug borehole,tmc
Read morePre-monsoon and post-monsoon maintenance of ht and lt overhead lines maintenance and cleaning of weed growth near the overhead lines for three years
Pre-monsoon and post-monsoon maintenance of ht and lt overhead lines maintenance and cleaning of weed growth near the overhead lines for three years
Read more11kv overhead lines shifting and heightening works for ukwa mine
11kv overhead lines shifting and heightening works for ukwa mine.
Read moreof your Industry type