Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Retaining Wall At Udalshem In Sy.No.120/26 In V.P. Sancordem In Dharbandora Taluka. (Under Mla Lad Scheme)
|
Description |
Construction Of Retaining Wall At Udalshem In Sy.No.120/26 In V.P. Sancordem In Dharbandora Taluka. (Under Mla Lad Scheme)
|
Organisation | Government of Goa |
Tender Id | 2023_PWD_9887_1 |
Reference Number |
PWD/WDXXV/ASW/F-2/23-24/17L6 dt 10/07/2023 |
Tender Fee | 4000 |
EMD | 70306 |
Tender Value | |
Place | The Executive Engineer, Works Division XXV |
Link | https://eprocure.goa.gov.in |
Start Date | July 10, 2023 20:30 |
End Date |
24/07/2023 ( Expired 696 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of flyover at chainage km 165.020 (pastikudi) on nh-26 including approaches in the state of odisha on epc mode.
Construction of flyover at chainage km 165.020 (pastikudi) on nh-26 including approaches in the state of odisha on epc mode.
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConstruction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh
Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreAAAAAAAAAA
Login to viewConstruction of a new boundary wall at vasa stackyard at bishnupur i block in south 24 parganas district under south 24 parganas division pwd during the year 2025 2026
Read moreExecution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to
Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to
Read moreConstruction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Read moreof your Industry type