Tender Details

Particulars Details
Title
Immediate Restoration Of Pier Foundation And Flow Bed At Udalshem Bridge In V.P. Sancordem In Sanvordem Constituency.
Description
Immediate Restoration Of Pier Foundation And Flow Bed At Udalshem Bridge In V.P. Sancordem In Sanvordem Constituency.
Organisation Government of Goa
Tender Id 2023_PWD_9504_1
Reference
Number
PWD/WDXXV/ASW/F-2/23-24/12L4 dt 19/06/2023
Tender Fee 3000
EMD 31386
Tender Value
Place The Executive Engineer, Works Division XXV
Link https://eprocure.goa.gov.in
Start Date June 20, 2023 00:25
End Date

03/07/2023 ( Expired 729 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Read more
Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode

Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode

Read more
Development operation and maintenance of the mmlp pune at village pawalewadi maval taluka district pune in maharashtra through ppp on dbfot basis

Development operation and maintenance of the mmlp pune at village pawalewadi maval taluka district pune in maharashtra through ppp on dbfot basis

Read more
Development, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis

Development, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis

Read more
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Read more
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
801635 construction of deficient living in accommodation and airmen mess at afs hakimpet

Construction of deficient living in accommodation and airmen mess at afs hakimpet

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise