Tender Details

Particulars Details
Title
Ofc Patch Work Of Sonapur Jagi Road (2.5 Km) Jagi Road Mahadevgaon (2.5 Km), Daboka Nagaon (5.5 Km) , Nagaon Mahadevgaon (1.2 Km) And Nagaon Misa(4.7 Km)in Bsnl Cn Tx Ner Guwahati Division
Description
Ofc Patch Work By Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing And Splicing Works Sonapur Jagi Road (2.5 Km) Jagi Road Mahadevgaon (2.5 Km), Daboka Nagaon (5.5 Km) , Nagaon Mahadevgaon (1.2 Km) And Nagaon Misa(4.7 Km)
Organisation Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings
Tender Id 2024_BSNL_211375_1
Reference
Number
CNTXNER/GH-BA/GHY/PW2
Tender Fee 590
EMD 83104
Tender Value
Place Nagaon
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=231936
Start Date October 15, 2024 23:30
End Date

05/11/2024 ( Expired 243 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Work of one time treatment of bypassed portion of dharuhera town on nh 919, ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.

Work of one time treatment of bypassed portion of dharuhera town on nh 919,&#x0d ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.

Read more
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Selection of an agency to provide jcb for housekeeping work in ffp,hmbp, hmtp and ta div and demolition work in ta division for a period of one year through rate contract

Selection of an agency to provide jcb for housekeeping work in ffp,hmbp, hmtp and ta div and demolition work in ta division for a period of one year through rate contract

Read more
Cement concrete road and drain construction work in the street of bhairu maharaj temple under ward no. 13

Cement concrete road and drain construction work in the street of bhairu maharaj temple under ward no. 13

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise