Tender Details
Particulars | Details |
---|---|
Title |
Repair Of War Screen Chamber Wall In Plaster Work On Etp And Equalization Tank, Oil Tank Etc. In Season 2024 25
|
Description |
Repair Of War Screen Chamber Wall In Plaster Work On Etp And Equalization Tank, Oil Tank Etc. In Season 2024 25
|
Organisation | The Kisan Sahkari Chini Mills Ltd. Tilhar Shahjahanpur | State Govt. and UT |
Tender Id | 2024_TKSCT_968612_1 |
Reference Number |
KSCM-TILHAR/838/24.10.2024 |
Tender Fee | 590 |
EMD | 3000 |
Tender Value | |
Place | KSCM TILHAR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1695549 |
Start Date | October 29, 2024 00:15 |
End Date |
06/11/2024 ( Expired 214 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreRectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreof your Industry type