Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Selection Of Parking Contractor To Operate The Noida Surface Parking Sites (Off Street/ On Street) In Cluster V (Work Circle 4, Sector 63,64,65) Area Of Noida
|
Description |
Selection Of Parking Contractor To Operate The Noida Surface Parking Sites (Off Street/ On Street) In Cluster V (Work Circle 4, Sector 63,64,65) Area Of Noida&Amp#X0d
|
Organisation | New Okla Industrial Development Authority | State Govt. and UT |
Tender Id | 2024_NOIDA_973157_1 |
Reference Number |
26/DGM(NTC)/SM(NTC)/2022-23 |
Tender Fee | 8260 |
EMD | 10.93 Lakh |
Tender Value | |
Place | NOIDA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1718275 |
Start Date | November 28, 2024 14:30 |
End Date |
04/12/2024 ( Expired 210 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreE.l.d.c.no/smii/p5/1233/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 3 zones 6 and 9
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 3 zones 6 and 9&#x0d
Read moreE.l.d.c.no/smii/p3/1234/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 4 zones 11 12 13and15
E.l.d.c.no/smii/p3/1234/2024&#x0d &#x0d selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 4 zones 11 12 13and15&#x0d
Read moreE.l.d.c.no/smii/p1/1231/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5&#x0d
Read moreE.l.d.c.no/smii/p5/1232/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 2 zones 7 8 and10
&#x0d &#x0d selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 2 zones 7 8 and10&#x0d
Read moreSelection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur
Selection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreConstruction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)
Construction of 4 new foot over bridges in&#x0d indore on design, built, operate and transfer&#x0d basis and maintenance of existing three fobs&#x0d for license period of 10 years (extendable to&#x0d five years)
Read moreM/o drain (re-construction of rcc drain and culvert on all link road (s-6) to 24.00 mtr. wide road in sector-2), noida
M/o drain (re-construction of rcc drain and culvert on all link road (s-6) to 24.00 mtr. wide road in sector-2), noida
Read moreof your Industry type