Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Construction Opportunity: Reinforced Earth (Rub) Structure 🏗️ The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of A Reinforced Earth (Rub) Of Size 3x2.5 Meters At The Already Closed Level Crossing (Lc) No 54 Km 60/1 2, Between Idgah Bayana Rail Line, Using The Pushing Technique. 🛤️ 📅 Tender Submission Deadline: June 18, 2024, 3:00 Pm Interested Contractors Must Submit A Tender Security Of Inr 2,22,300. No Tender Fee Is Payable. Detailed Tender Documents Are Available For Review, Providing Comprehensive Information On Project Specifications, Requirements, And Procedures. Keywords: Construction, Reinforced Earth Structure, Ministry Of Railways, Level Crossing, Tender, Central Government, Infrastructure Project, Rub Construction| Particulars | Details |
|---|---|
| Title |
Construction Of Rub Of Size 3x2.5 M At Already Closed Lc No 54 Km 60/1 2 In Between Idgah Bayana Rail Line By Pushing Technique.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75155817 |
|
Reference Number |
CEN00AGC1024 |
| Tender Fee | 0 |
| EMD | 2.22 Lakh |
| Tender Value | |
| Place | Allahabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75155817/viewNitPdf_4572732.pdf |
| Start Date | May 16, 2024 18:47 |
| End Date |
Expired
18/06/2024
Expired 737 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreConstruction of rub of size 3x2.5 m at already closed lc no 54 km 60/1-2 in between idgah-bayana rail line by pushing technique.
For complete deion and other details, please refer to tender
Read moreConstruction of rub of size 3x2.5 m at already closed lc no 54 km 60/1-2 in between idgah-bayana rail line by pushing technique.
For complete deion and other details, please refer to tender
Read moreConstruction of rub of size 3x2.5 m at already closed lc no 54 km 60/1-2 in between idgah-bayana rail line by pushing technique.
For complete deion and other details, please refer to tender
Read moreElectrical trd portion of work in connection with 1) elimination of lc no.19 at km 271/3-4 between dd-brb station by providing rub of size 6.0 x 5.15 by pushing technique in dd-sur section 2) elimination of lc no.41 at km 390/1-2 between wds-ma station by providing rub of size 6.0 x 5.15 by pushing technique in dd-sur section 3) provision of additional rub at location 409/2-3 by pushing method in kwv-lur section 4) provision of gabion wall, ballast retaining wall, toe wall, protection work etc
For complete deion and other details, please refer to tender
Read moreRajkot division :- providing rub of box 4 x 2.5 size by pushing method at km. 674.09 near closed lc 72 between than - lakhamanchi on surendranagar - wankaner section.
For complete deion and other details, please refer to tender
Read moreAmravati-narkhed section - construction of rub by pushing/sliding method in lieu of 1.lc no.50 km. 767.869 2.lc no.59 km. 797.915
For complete deion and other details, please refer to tender
Read moreAmravati-narkhed section - construction of rub by pushing/sliding method in lieu of 1.lc no.55 km. 779.281 2.lc no.56 km. 779.950
For complete deion and other details, please refer to tender
Read moreConstruction of a new rub (rail under bridge) by box pushing technique in connection with construction of independent up line for movement of trains to mechanical handling plants of ppa
Construction of a new rub (rail under bridge) by box pushing technique in connection with construction of independent up line for movement of trains to mechanical handling plants of ppa
Read moreSignaling and telecom work in connection with elimination of lc no.19 at km. 271/3-4 between daund-boribial station by providing rub of size 6.0 x 5.15 by pushing technique in solapur division.
For complete deion and other details, please refer to tender
Read moreof your Industry type