Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rub/Lhs In Lieu Of Lc Rv 228 &Amp Rv 230 In The Block Section Between Mngd Bmck Of Sambalpur Division By Air Pushing Technique.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77991972 |
Reference Number |
42-eT-DENS-SBP-24 |
Tender Fee | 0 |
EMD | 7.43 Lakh |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77991972/viewNitPdf_4744767.pdf |
Start Date | October 25, 2024 22:10 |
End Date |
22/11/2024 ( Expired 151 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreProviding architectural and engineering consultancy services for construction of rob in lieu of lc no. 57 at km 198 17 19 between amarda road
Providing architectural and engineering consultancy services for construction of rob in lieu of lc no. 57 at km 198 17 19 between amarda road and basta of kharagpur division, odisha
Read moreConstruction of 30 nos. toilet water facilities for anganwari center in govt. building block boram under d.w.and s. division, adityapur for the year 2025-26.(group 5)
Construction of 30 nos. toilet water facilities for anganwari center in&#x0d govt. building block boram under d.w.and s. division, adityapur for&#x0d the year 2025-26.(group 5)
Read moreRepair and re construction work of jamak canal damaged by the under construction kamar motor road of pmgsy division uttarkashi in bhatwadi block distt-uttarkashi (reach -0.00 km to 1.000 km)
Repair and re construction work of&#x0d jamak canal damaged by the under&#x0d construction kamar motor road of&#x0d pmgsy division uttarkashi in&#x0d bhatwadi block distt-uttarkashi&#x0d (reach -0.00 km to 1.000 km)
Read moreRectification of blackspot by construction of major bridge at km 306.184 lhs, construction of lvup at km 306.825 along with slip service roads and construction of lvup at km 376.739 along with slip service roads in hospet to chitradurga road section
Rectification of blackspot by construction of major bridge at km 306.184 lhs, construction of lvup at km 306.825 along with slip service roads and construction of lvup at km 376.739 along with slip service roads in hospet to chitradurga road section
Read moreKlc section 2construction of
Klc section 2 construction of&#x0d cupboard in health clinic in nila block of mla&#x0d hostel
Read moreof your Industry type