Particulars | Details |
---|---|
Title |
Construction Of 33 Kv Line From 132 33 Kv S S Gida Gorakhpur To Suthani Sahjanwa Waste To Charcol And Cng Plant 6 Mva Distt Gorakhpur For Un Intrrepted 24 Hours Power Supply Under The Head Of Deposit Scheme Year
|
Description |
Construction Of 33 Kv Line From 132 33 Kv S S Gida Gorakhpur To Suthani Sahjanwa Waste To Charcol And Cng Plant 6 Mva Distt Gorakhpur For Un Intrrepted 24 Hours Power Supply Under The Head Of Deposit Scheme Year
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_1041581_1 |
Reference Number |
construction of 33 KV UG Line Suthani |
Tender Fee | 8790 |
EMD | 7.45 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1889601 |
Start Date | May 22, 2025 18:30 |
End Date |
28/05/2025 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Special repair/replacement of ht cable 11000 volts from 33/11 kv shekhawati grid to mrs chitral line under ge(u) elect supply delhi cantt-10
Special repair/replacement of ht cable 11000 volts from 33/11 kv shekhawati grid to mrs chitral line under ge(u) elect supply delhi cantt-10
Read moreConstruction of 33 kv ug electric line from kamla inter college to near ankur udyog nh 27 proposed railway crossing area gida gorakhpur
Construction of 33 kv ug electric line from kamla inter college to near ankur udyog nh 27 proposed railway crossing area gida gorakhpur
Read moreSupply, fixing and laying of 160mm dia. hdpe pipe, m.s flanges, m.s bends and sluice valves with all accessories from newly laid power bore well to 8mgd and 11mgd filtration plant overhead tank in head water works. (2nd call)
Supply, fixing and laying of 160mm dia. hdpe pipe, m.s flanges, m.s bends and sluice valves with all accessories from newly laid power bore well to 8mgd and 11mgd filtration plant overhead tank in head water works. (2nd call)
Read moreAmc for day to day repair and maintenance of 220volt 440volt 550volt over head line and street lighting of different types of colonies water supply mines haulage fan and power supply of govindpur project u/g for the period of one (01) year or
Amc for day to day repair and maintenance of 220volt 440volt 550volt over head line and street lighting of different types of colonies water supply mines haulage fan and power supply of govindpur project u/g for the period of one (01) year or
Read moreSupply, erection, testing and commissioning of 220 kv 2nd burnpur s/c lilo line from 220 kv kalyaneswari-mejia (l#240) line as part of power supply augmentation scheme of isp
Supply, erection, testing and commissioning of 220 kv 2nd burnpur s/c lilo line from 220 kv kalyaneswari-mejia (l#240) line as part of power supply augmentation scheme of isp
Read moreDismantling loading unloading transportation from takari lis st.2 to tembhu lis st.1a and erection testing and commissioning of 50 mva 220, 33 kv and 25 mva, 33,6.6 kv power transformer at tembhu lis st.1a at tembhu
Dismantling loading unloading transportation from takari lis st.2 to tembhu lis st.1a and erection testing and commissioning of 50 mva 220, 33 kv and 25 mva, 33,6.6 kv power transformer at tembhu lis st.1a at tembhu
Read moreConstruction of 33 kv line to provide power supply to numaligarh refinery limited, co lakhyadhar kalita, vill patgirichuba, p.o. dhekipara, sipajhar, dist darrang assam under sipajhar esd under deposit work on full turnkey mode
Construction of 33 kv line to provide power supply to numaligarh refinery limited, co lakhyadhar kalita, vill patgirichuba, p.o. dhekipara, sipajhar, dist darrang assam under sipajhar esd under deposit work on full turnkey mode
Read moreAll work related to pring oil leakage from the radiator of 05 mva power transformer no. 01 installed at 33/11 kv power substation under edd- sikandrabad, bulandshahr.
All work related to pring oil leakage from the radiator of 05 mva power transformer no. 01 installed at 33/11 kv power substation under edd- sikandrabad, bulandshahr.
Read moreDesign, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Design, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Read moreAugmentation of power transformer capacity from (2x6.3) mva to (3x6.3) mva, and other allied works at purandarpur 33/11 kv substation under suri division, wbsedcl.
Augmentation of power transformer capacity from (2x6.3) mva to (3x6.3) mva, and other allied works at purandarpur 33/11 kv substation under suri division, wbsedcl.
Read moreof your Industry type