Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting And Reconstruction Of Lt/Ht Line With Ss Of Chhatia Salepur Road From26.00 Km To 27.613 Km Due To Widening And Strengthening Of Road Under Chhatia Electrical Section Of Barachana Sub Division
|
| Description |
Shifting And Reconstruction Of Lt/Ht Line With Ss Of Chhatia Salepur Road From26.00 Km To 27.613 Km Due To Widening And Strengthening Of Road Under Chhatia Electrical Section Of Barachana Sub Division
|
| Organisation | EIC-CIVIL | State Govt. and UT |
| Tender Id | 2024_EICCL_101278_1 |
|
Reference Number |
SE CBT (R and B)-40/2023-24 |
| Tender Fee | 6000 |
| EMD | 19400 |
| Tender Value | - |
| Place | Badachana |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=494027 |
| Start Date | February 17, 2024 17:30 |
| End Date |
Expired
26/02/2024
Expired 958 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting and erection of existing ht tgfenco poles towards lingapuram for road widening works in rmc (under gf) (2nd call)
Shifting and erection of existing ht tgfenco poles towards lingapuram for road widening works in rmc (under gf) (2nd call)
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreShifting of ht/lt line due ...
Shifting of ht/lt line due to road widening from gudiyani to surkhpur tappa under op s/divn kosli during year 2025-2026.
Read moreShifting of ht lines due to...
Shifting of ht lines due to rehabilitation and up-gradation of gurgaon-pataudi-rewari section of nh-352w from hero honda chowk to umang bhardwaj chowk, gurugram.
Read moreShifting and reconstruction of lt ht line with ss from karanji bus stand to srikhetra due to widening and strengthening of road under tangi electrical section in the district of cuttack
Shifting and reconstruction of lt ht line with ss from karanji bus stand to srikhetra due to widening and strengthening of road under tangi electrical section in the district of cuttack
Read moreShifting /relocation of existing electrical ss, ht and lt lines due to construction of alternative road from nh-53 to balichandrapur from 0.00 km to 0.480 km by (r and b) under chhatia section
Shifting /relocation of existing electrical ss, ht and lt lines due to construction of alternative road from nh-53 to balichandrapur from 0.00 km to 0.480 km by (r and b) under chhatia section
Read moreShifting and reconstruction of lt / ht line from krushanadaspur to udayagiri 0.00 km to 17.320 km to widening and strengthening of road by r and b under balichandrapur electrical section of barachana for the year 2023-24
Shifting and reconstruction of lt / ht line from krushanadaspur to udayagiri 0.00 km to 17.320 km to widening and strengthening of road by r and b under balichandrapur electrical section of barachana for the year 2023-24
Read moreShifting of ht/lt line due to widening and strengthening of road village babail to mohali at district panipat.
Shifting of ht/lt line due to widening and strengthening of road village babail to mohali at district panipat.
Read moreShifting of 200 kva prachi dtc no 4464037 ht overhead line by underground ht cable due road widening work at jain mandir hall to prachi building
Shifting of 200 kva prachi dtc no 4464037 ht overhead line by underground ht cable due road widening work at jain mandir hall to prachi building
Read moreof your Industry type