Tender Details

Particulars Details
Title
Restoration Protection Work From Km 179870 To Km 179930 Railway Ch. 8478 Km 181000 To Km. 181025 Railway Ch. 8578 Along The Pathankot Joginder Nagar Railway Line, On The Shimla Mataur Corridor In The State Of Himachal Pradesh On Item Rate
Description
Restoration Protection Work From Km 179870 To Km 179930 Railway Ch. 8478 Km 181000 To Km. 181025 Railway Ch. 8578 Along The Pathankot Joginder Nagar Railway Line, On The Shimla Mataur Corridor In The State Of Himachal Pradesh On Item Rate
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 10000
EMD 11.98 Lakh
Tender Value
Place Hamirpur
Link

AAAAAAAAAA

Login to view
Start Date June 17, 2025 21:30
End Date

08/07/2025 ( 20 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Restoration protection work from km 179870 to km 179930 railway ch. 8478 km 181000 to km. 181025 railway ch. 8578 along the pathankot-joginder nagar railway line, on the shimla mataur corridor in the state of himachal pradesh on item rate

Restoration protection work from km 179870 to km 179930 railway ch. 8478 km 181000 to km. 181025 railway ch. 8578 along the pathankot-joginder nagar railway line, on the shimla mataur corridor in the state of himachal pradesh on item rate

Read more
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor

Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor

Read more
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.

Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.

Read more
Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis

Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis

Read more
Short term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis

Short term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis

Read more
Rehabilitation of railway over bridge at rayagada from ch. 202.175 to km. 202.790 and nagavali river bridge from km. 192.797 to km. 193.050 of nh326 under item rate contract in the state of odisha.

Rehabilitation of railway over bridge at rayagada from ch. 202.175 to km. 202.790 and nagavali river bridge from km. 192.797 to km. 193.050 of nh326 under item rate contract in the state of odisha.

Read more
Overlay and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.360 to km 208.600 in uttar pradesh n uttarakhand on item rate (percentage) basis

Overlay and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.360 to km 208.600 in uttar pradesh n uttarakhand on item rate (percentage) basis

Read more
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage

Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage

Read more
Short term improvement, routine maintenance including incident management services and emergent overlay works in agra gwalior section of nh 44 from km 13.000 to km 103.000 in the state of uttar pradesh rajasthan and madhya pradesh on item rate percen

Short term improvement, routine maintenance including incident management services and emergent overlay works in agra gwalior section of nh 44 from km 13.000 to km 103.000 in the state of uttar pradesh rajasthan and madhya pradesh on item rate percen

Read more
Construction of new railway siding with proposed feeder line of east rail corridor at pelma, raigarh area of secl taking off from bhalumuda pelma section under secr ch minus 1527 28481.542 f ggda to ch 1156.91m 31165.452m f ggda about 2.7 km

Construction of new railway siding with proposed feeder line of east rail corridor at pelma, raigarh area of secl taking off from bhalumuda pelma section under secr ch minus 1527 28481.542 f ggda to ch 1156.91m 31165.452m f ggda about 2.7 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise