Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Restoration Protection Work From Km 179870 To Km 179930 Railway Ch. 8478 Km 181000 To Km. 181025 Railway Ch. 8578 Along The Pathankot Joginder Nagar Railway Line, On The Shimla Mataur Corridor In The State Of Himachal Pradesh On Item Rate
|
Description |
Restoration Protection Work From Km 179870 To Km 179930 Railway Ch. 8478 Km 181000 To Km. 181025 Railway Ch. 8578 Along The Pathankot Joginder Nagar Railway Line, On The Shimla Mataur Corridor In The State Of Himachal Pradesh On Item Rate
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 11.98 Lakh |
Tender Value | |
Place | Hamirpur |
Link |
AAAAAAAAAA Login to view |
Start Date | June 17, 2025 21:30 |
End Date |
08/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Restoration protection work from km 179870 to km 179930 railway ch. 8478 km 181000 to km. 181025 railway ch. 8578 along the pathankot-joginder nagar railway line, on the shimla mataur corridor in the state of himachal pradesh on item rate
Restoration protection work from km 179870 to km 179930 railway ch. 8478 km 181000 to km. 181025 railway ch. 8578 along the pathankot-joginder nagar railway line, on the shimla mataur corridor in the state of himachal pradesh on item rate
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read morePeriodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis
Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis
Read moreShort term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis
Short term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis
Read moreRehabilitation of railway over bridge at rayagada from ch. 202.175 to km. 202.790 and nagavali river bridge from km. 192.797 to km. 193.050 of nh326 under item rate contract in the state of odisha.
Rehabilitation of railway over bridge at rayagada from ch. 202.175 to km. 202.790 and nagavali river bridge from km. 192.797 to km. 193.050 of nh326 under item rate contract in the state of odisha.
Read moreOverlay and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.360 to km 208.600 in uttar pradesh n uttarakhand on item rate (percentage) basis
Overlay and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.360 to km 208.600 in uttar pradesh n uttarakhand on item rate (percentage) basis
Read moreMonsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Read moreShort term improvement, routine maintenance including incident management services and emergent overlay works in agra gwalior section of nh 44 from km 13.000 to km 103.000 in the state of uttar pradesh rajasthan and madhya pradesh on item rate percen
Short term improvement, routine maintenance including incident management services and emergent overlay works in agra gwalior section of nh 44 from km 13.000 to km 103.000 in the state of uttar pradesh rajasthan and madhya pradesh on item rate percen
Read moreConstruction of new railway siding with proposed feeder line of east rail corridor at pelma, raigarh area of secl taking off from bhalumuda pelma section under secr ch minus 1527 28481.542 f ggda to ch 1156.91m 31165.452m f ggda about 2.7 km
Construction of new railway siding with proposed feeder line of east rail corridor at pelma, raigarh area of secl taking off from bhalumuda pelma section under secr ch minus 1527 28481.542 f ggda to ch 1156.91m 31165.452m f ggda about 2.7 km
Read moreof your Industry type