Tender Details

Particulars Details
Title
Sc Services During On M Stage Of Jaisalmer Barmer Section And Barmer Sanchore Gandhav Gujarat Border Section (Total Length 269.377) Of Nh 68 In The State Of Rajasthan
Description
Sc Services During On M Stage Of Jaisalmer Barmer Section And Barmer Sanchore Gandhav Gujarat Border Section (Total Length 269.377) Of Nh 68 In The State Of Rajasthan
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_231382_1
Reference
Number
NHAI/11011/1/Tenders-ROJ/ SC-JB-BSG/
Tender Fee 5000
EMD 0
Tender Value
Place NHAI RO JAIPUR
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=261284
Start Date March 27, 2025 23:30
End Date

15/05/2025 ( Expired 42 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Read more
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Development, operation and maintenance of wayside amenities of jodhpur ring road section of nh-125a in the state of rajasthan 2 o-m sitesnh-125a/karwar/ch. 73-620/lhs

Development, operation and maintenance of wayside amenities of jodhpur ring road section of nh-125a in the state of rajasthan 2 o-m sitesnh-125a/karwar/ch. 73-620/lhs

Read more
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu

Read more
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Read more
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).

Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).

Read more
Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise