Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Speed Indicating Cum Recording Unit Along With
Ind
|
| Description |
1)speed Indicating Cum Recording Unit Along With
Indicator Unit For Detc Application As Per Bhel
Specification No. Tsg/3.5/Sp0004/T01 (Rev.05) Dt. 29.12.2023 Qty: 70 St
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | E5033007 |
|
Reference Number |
E5033007 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | BHOPAL |
| Link |
View Original Tender Notice
https://bhel.abcprocure.com/EPROC/ |
| Start Date | January 05, 2024 22:30 |
| End Date |
Expired
16/01/2024
Expired 910 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ultra violet (uv) lens optics along with opto-mechanical assembly
Development of ultra violet (uv) lens optics along with opto-mechanical assembly
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreDdition / alteration/ upgration of perimeter wall and main drain along with allied facilities at sspl under ge(i) r and d delhi
Addition / alteration/ upgration of perimeter wall and main drain along with allied facilities at sspl under ge(i) r and d delhi
Read moreScraping and painting works at room no 16 to18 of main block, second floor along with east and central stair case within the compound of writers buildings during the year 2026-2027
Scraping and painting works at room no 16 to18 of main block, second floor along with east and central stair case within the compound of writers buildings during the year 2026-2027
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreSpeed indicating cum recording unit along with ind
1)speed indicating cum recording unit along with indicator unit for detc application as per bhel specification no. tsg/3.5/sp0004/t01 (rev.05) dt. 29.12.2023 qty: 100 st
Read moreSpeed indicating cum recording unit
For complete deion and other details, please refer to tender
Read moreE5033007_speed indicating cum recording unit
Speed indicating cum recording unit along withindicator unit for detc application as per bhelspecification no. tsg/3.5/sp0004/t01 (rev.05) dt. 29.12.2023
Read moreSpeed recording cum indicator unit
For complete deion and other details, please refer to tender
Read moreof your Industry type