Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Road From Twisa Bazar To Khamper Para During The Year 2024 25 / Sh Patch Grouting, Wbm Iii, Carpeting, Seal Coat Etc.(L 0.80 Km)/2nd Call
|
| Description |
Maintenance Of Road From Twisa Bazar To Khamper Para During The Year 2024 25 / Sh Patch Grouting, Wbm Iii, Carpeting, Seal Coat Etc.(L 0.80 Km)/2nd Call
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_55244_1 |
|
Reference Number |
89/DNIT/EE/MNP/PWD(R n B)/2024-25 |
| Tender Fee | 1000 |
| EMD | 42108 |
| Tender Value | - |
| Place | Mohanpur |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=56947 |
| Start Date | December 18, 2024 23:30 |
| End Date |
Expired
06/01/2025
Expired 646 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.
Development of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.
Read moreDevelopment of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreDevelopment of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Read moreDevelopment of road from nh 08 to nh 08 via east raitwisa h s school in c allied road at betcherra t length 700 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch gsb patch wbm and carpeting etc
Development of road from nh 08 to nh 08 via east raitwisa h s school in c allied road at betcherra t length 700 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch gsb patch wbm and carpeting etc
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 1720 00 mtr to ch 2600 0
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 1720 00 mtr to ch 2600 0
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 860 00 mtr to ch 1720 00
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 860 00 mtr to ch 1720 00
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 0 00 mtr to 860 00 mtr
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 0 00 mtr to 860 00 mtr
Read moreMaintenance of road from sarbajoy para to lefunga bazar during the year 2023-24 / sh patch grouting, patch wbm, carpeting etc.(l-1.260 km)
Maintenance of road from sarbajoy para to lefunga bazar during the year 2023-24 / sh patch grouting, patch wbm, carpeting etc.(l-1.260 km)
Read moreof your Industry type