Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Up Gradation Of Circular Road Around Awahdevi Temple Km 000 To 1 800 In District Hamirpur Hp Sh Removal Of Formation Deficiency C/O R Wall C/O Parapet Pcc Side Drain Mt Works Cc Pavement Paverblock Hume Pipe Culvert Road Furniture Under Nabard Ridf
|
| Description |
Up Gradation Of Circular Road Around Awahdevi Temple Km 000 To 1 800 In District Hamirpur Hp Sh Removal Of Formation Deficiency C/O R Wall C/O Parapet Pcc Side Drain Mt Works Cc Pavement Paverblock Hume Pipe Culvert Road Furniture Under Nabard Ridf
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_121969_1 |
|
Reference Number |
12918-58 dated 26-11-2025 |
| Tender Fee | 7000 |
| EMD | 4.01 Lakh |
| Tender Value | |
| Place | Bhoranj |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=178894 |
| Start Date | November 29, 2025 15:30 |
| End Date |
Expired
04/12/2025
Expired 203 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Up gradation of tikker manoh via jakhyol ramhera sulkhan dhirwin road km 0 000 to 12 195 under nabard ridf xxx
Sh removal of formation deficiency c/o r wall gabions wall m t works cc pavement pcc u v shape drain cross drainage work road furniture from km 0 000 to 12 195 including 5 years maintenance
Read moreUpgradation of tikker manoh via jakhyol ramera sulkhan dhirwin road under nabard tikker to manoh via dhirwin
Sh removal of formation deficiency c o r wall gabions wall mt works cc pavement pcc v shape drain cross drained work road furniture from 0 00 to 7 000
Read moreUpgradation of tikker manoh via jakhyol ramera sulkhan dhirwin road under nabard portion tikker jakhyol remera sulkhan
Sh removal of formation deficiency c o r wall gabions wall m t works cc pavement pcc v shape drain cross drained work road furniture from 7 00 to 12 195
Read moreConstruction of link road tikker manhasa to gouta via sangarwar samolg km 0 00 to 2 940 i c 1 no bridge at km 0 00 to 2 310 under nabard ridf xxxi
Sh removal of formation deficiency co rwall gabions wall mt works pcc v shape drain cross drainage work road furniture co paver block co rain shelter 1 no bridge at km 2 310
Read moreC/o industrial training institute at sujanpur tihra distt. hamirpur (hp)
C/o u-shape drain pcc drain around the building with iron grating, wire fencing with barded wire around the iti campus, levelling of the ground and construction of protection work ay ground laying of paver block of approach road and construction of
Read moreConstruction of balance work i/c mettaling tarring of link road from chakra to sherpur km 0/000 to 6/955 in district chamba (hp) ridf-xxxi (nabard)
Sub-head formation cutting passing places r/wall gsb wbm-ii wbm-iii tarring work cc pavement side drain and parapets including five year routine maintenance)
Read moreConstruction of link road from jawar to nari via billan da thapal ghagoh in distt una himachal pradesh from km 000 to 5950
Sh removal of formation deficiency cd works retaining wall cc pavement gsb wmm mt works pcc drain and parapets and minor bridge c/o 20 meter rcc girder bridge at rd 2920 under nabard ridf xxix
Read moreConstruction of chaprehar wah toru road km 0/000 to 5/000 under (nabard) ridf-xxix in district kangra (hp)
F/c, c/o r/wall cd work, p/l gramular sub base, wbm-ii, wbm-iii, tarring, cement concrete pavement, road side drain, parapets and providing and fixing sign boards etc i/c maintenance for five year after completer of construction work.)
Read moreConstruction of chaprehar wah toru road km 0/000 to 5/000 under (nabard) ridf-xxix in district kangra (hp)
F/c, c/o r/wall cd work, p/l gramular sub base, wbm-ii, wbm-iii, tarring, cement concrete pavement, road side drain, parapets and providing and fixing sign boards etc i/c maintenance for five year after completer of construction work.)
Read moreConstruction of chaprehar wah toru road km 0/000 to 5/000 under (nabard) ridf-xxix in district kangra (hp)
F/c, c/o r/wall cd work, p/l gramular sub base, wbm-ii, wbm-iii, tarring, cement concrete pavement, road side drain, parapets and providing and fixing sign&#x0d boards etc i/c maintenance for five year after completer of construction work.)
Read moreof your Industry type