T.S.No.04/2024 25 Of Se/Gc/Salem (Gl)
Description
Conducting Detailed Survey, Collecting All Necessary Data And Preparation Of Land Plan Schedule For Assessment Of Land Compensation Along The Transmission Line Corridor For The Various Ongoing, Completed 110 Kv And 230 Kv Schemes Line Work Of Tlc I
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_507967_1
Reference
Number
T.S.No.04/2024-25 of SE/GC/Salem (GL)
Tender Fee 0
EMD 17300
Tender Value
Place SALEM
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=604253

Start Date December 06, 2024 00:10
End Date
Expired 20/12/2024

Expired 545 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Conducting preliminary survey detailed survey for the proposed eht line for transmission schemes 230 110kv and preparation of electrical cum civil layout at various places in tlc thanjavur division on running contract basis

Conducting preliminary survey detailed survey for the proposed eht line for transmission schemes 230 110kv and preparation of electrical cum civil layout at various places in tlc thanjavur division on running contract basis

Read more
Conducting preliminary survey detailed survey for the proposed eht line for transmission schemes 230 110kv and preparation of electrical cum civil layout at various places in tlc thanajavur division jurisdiction on running contract basis

Conducting preliminary survey detailed survey for the proposed eht line for transmission schemes 230 110kv and preparation of electrical cum civil layout at various places in tlc thanajavur division jurisdiction on running contract basis

Read more
Quantifying silt deposited and assessment of storage capacity in upper aliyar dam located in coimbatore district by conducting bathymetry survey using appropriate technology and preparation of land plan schedule

Quantifying silt deposited and assessment of storage capacity in upper aliyar dam located in coimbatore district by conducting bathymetry survey using appropriate technology and preparation of land plan schedule

Read more
T.s.no.04/2025-26 of se/gc/salem (gl)

Conducting detailed survey, collecting all necessary data and preparation of land plan schedule for assessment of land compensation along the transmission line corridor for the various ongoing 110 kv and 230 kv schemes line work of tlc/ thirupathur

Read more
T.s.no.03/2024-25 of se/gc/salem (gl)

Conducting detailed survey, collecting all necessary data and preparation of land plan schedule for assessment of land compensation along the transmission line corridor for the various ongoing 110 kv and 230 kv schemes line work of tlc-ii sub-divisio

Read more
Preparation of master plan and route survey for construction of 1 no 132 kv grid substation at missamari along with the associated transmission lines under aegcl

Preparation of master plan and route survey for construction of 1 no 132 kv grid substation at missamari along with the associated transmission lines under aegcl

Read more
General study of kerala coastal belt 2023 to 24 conducting physical survey and collecting field data under coastal engineering section kollam

General study of kerala coastal belt 2023 to 24 conducting physical survey and collecting field data along the coast from paravoor pozhi cp 288 to kayamkulam pozhi cp 499 under coastal engineering section kollam during the periodjuly2023 to june2024

Read more
Preparation of master plan for 220/132 kv umrangsu gis and survey of 220 kv double circuit transmission line from apgcl kopili gss to new umrangsu gis

Preparation of master plan for 220/132 kv umrangsu gis and survey of 220 kv double circuit transmission line from apgcl kopili gss to new umrangsu gis

Read more
Conducting preliminary survey and detailed survey and total station for providing route alignment for the eht line and 33 kv at various places in tlc trichy on running contract basis for one year from the date of awarding of survey work.

Conducting preliminary survey and detailed survey and total station for providing route alignment for the eht line and 33 kv at various places in tlc trichy on running contract basis for one year from the date of awarding of survey work.

Read more
Preparation of digital land use map of kalyaneswary project with geo-referencing and preparation of mouza-wise plot schedule along with demographic survey of the left out/safety zone area (600 acres approx.)

Preparation of digital land use map of kalyaneswary project with geo-referencing and preparation of mouza-wise plot schedule along with demographic survey of the left out/safety zone area (600 acres approx.)