Tender Details
Particulars | Details |
---|---|
Title |
Epcc Package For Epu, Ethylene Drying And Co2 Removal Unit Paradip
|
Description |
Epcc Package For Design, Engineering, Manufacture, Transportation, Installation, Testing, Commissioning And Performance Guarantee Test Runs Of Ethylene Purification Unit And Ethylene Drying And Co2 Removal Unit To Produce Impact And Random Co Polymer
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | IOCL PARADIP REFINERY |
Link |
AAAAAAAAAA Login to view |
Start Date | May 15, 2025 18:30 |
End Date |
25/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreVru package for iocl barauni refinery
Epcc package (epcc-15) for vapour recovery unit (vru) for barauni refinery capacity expansion (to 9.0 mmtpa) project of indian oil corporation limited
Read moreJp/b862-000-eb-t-0020/1021 - 220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreJp/b862-102-lz-mr-4040/513 - bagging and palletizing package for pdh pp plant with ethane and propane handling facilities project of petronet lng limited, dahej (gujarat)
Bagging and palletizing package for pdh pp plant with ethane and propane handling facilities project of petronet lng limited, dahej (gujarat)
Read moreJp/b862-000-pf-t-4350/1018 - compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreTower package tw04
Tower package tw04 for rohtang pass portion i.e. marhi khoksar section of 350 kv hvdc pang kaithal line and sissu khoksar and marhi solang valley section of 350 kv hvdc pang kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw leh kaithal transmission corridor
Read moreEoi for setting up pilot project for capture of co2 and so2 from the flue gas of a coal-fired unit, utilizing a non-amine-based technology which will be capable of using the existing wet limestone-based fgd system infrastructure.
Eoi for setting up pilot project for capture of co2 and so2 from the flue gas of a coal-fired unit, utilizing a non-amine-based technology which will be capable of using the existing wet limestone-based fgd system infrastructure.
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreof your Industry type