Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Floor Bed/ Foundation For Cnc 6 Axis Robotic Shot Peening Machine At Bay 4 Block 3 And Its Enclousre In Heep
|
Description |
Construction Of Floor Bed/ Foundation For Cnc 6 Axis Robotic Shot Peening Machine At Bay 4 Block 3 And Its Enclousre In Heep
|
Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
Tender Id | 2024_BHEL_39325_1 |
Reference Number |
BHEL/6200/202401621dt26.08.24 |
Tender Fee | 0 |
EMD | 13400 |
Tender Value | |
Place | HEEP |
Link | https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=41008 |
Start Date | August 27, 2024 14:30 |
End Date |
10/09/2024 ( Expired 282 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Read moreProvn of additional toilet block and allied works for living in billets at af stn vadodara
Provn of additional toilet block and allied works for living in billets at af stn vadodara
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreReplacement of ahu cooling coils installed at various underground metro stations of line 2, 3 and 6 in dmrc network.
Replacement of ahu cooling coils installed at various underground metro stations of line 2, 3 and 6 in dmrc network.
Read moreof your Industry type