Tender Details
Particulars | Details |
---|---|
Title |
Nhidcl/An/Balance Work/Middle Strait/3rd Call/2023
|
Description |
Construction Of Balance Works Of Major Bridge Over Middle Strait Creek Between Km. 106.590 To Km 108.553 Of Nh 04 In Ut Of Andaman Nicobar Islands 3rd Call
|
Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
Tender Id | 2023_NHIDC_785541_1 |
Reference Number |
|
Tender Fee | 23600 |
EMD | 1.99 Crore |
Tender Value | |
Place | Andaman Nicobar Islands |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=825752 |
Start Date | December 15, 2023 14:30 |
End Date |
19/01/2024 ( Expired 486 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreExecuting work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Executing work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Read moreBalance work for construction of security barrack at 400 kv gis substation chandwa under jipp a1 project
Balance work for construction of security barrack at 400 kv gis substation chandwa under jipp a1 project
Read moreProviding interior work including modular and loose furniture, electrical and allied works, hvac works, fire fighting work and signages for district and session court building, plot no. 2, sector-15 palghar new town, district palghar (2nd call).
Providing interior work including modular and&#x0d loose furniture, electrical and allied works, hvac&#x0d works, fire fighting work and signages for district&#x0d and session court building, plot no. 2, sector-15,&#x0d palghar new town, district palghar (2nd call).
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConstruction of balance work of 03 nos additional class rooms at govt middle school seeghat under (ladp) rr plan of rattle hepp
Please refer boq
Read moreStrengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreof your Industry type