Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Link Road From Mtn Barot To Bankaroli Via Sai Temple 0.00 To 0.800 Sh Providing And Laying Interlocking Paver Block At R.D. 0.600 To 0.800
|
Description |
Construction Of Link Road From Mtn Barot To Bankaroli Via Sai Temple 0.00 To 0.800 Sh Providing And Laying Interlocking Paver Block At R.D. 0.600 To 0.800
|
Organisation | Government of Himachal Pradesh |
Tender Id | 2023_PWD_75561_1 |
Reference Number |
1184-1208 dt 21.06.2023 |
Tender Fee | 500 |
EMD | 12200 |
Tender Value | |
Place | Fatehpur |
Link | https://hptenders.gov.in |
Start Date | June 28, 2023 16:30 |
End Date |
03/07/2023 ( Expired 695 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreConstruction of c.c. road and r.c.c. drain from kallu patel to arvind tiwari in gandhi ward, nagar palika parishad, gotegaon
Construction of c.c. road and r.c.c. drain from kallu patel to arvind tiwari in gandhi ward, nagar palika parishad, gotegaon
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of, main gate, installation of paver block drilling tubewell work at mcp pipla narayanwar, m.r.f. center at gangatwara susar pandhurna main road, under sbm-2
Construction of, main gate, installation of paver block drilling tubewell work at mcp pipla narayanwar, m.r.f. center at gangatwara susar pandhurna main road, under sbm-2
Read moreConstruction of road and drain from vardha ghare house to dr. kashyap hospital and construction of chabutra near peepal tree in ganesh ward, nagar palika parishad, kareli
Construction of road and drain from vardha ghare house to dr. kashyap hospital and construction of chabutra near peepal tree in ganesh ward, nagar palika parishad, kareli
Read moreof your Industry type