Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 02 Lane Rail Over Bridge On Level Crossing No 89 B At Anandi Devi On Naipalapur Kasraila Road In District Sitapur On Epc Mode
|
| Description |
Construction Of 02 Lane Rail Over Bridge On Level Crossing No 89 B At Anandi Devi On Naipalapur Kasraila Road In District Sitapur On Epc Mode
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPSBC_847194_1 |
|
Reference Number |
336/E-TENDER/CPM LKO/2023-24 DT 06.10.2023 |
| Tender Fee | 10000 |
| EMD | 41.65 Lakh |
| Tender Value | - |
| Place | LUCKNOW |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 07, 2023 15:30 |
| End Date |
Expired
30/10/2023
Expired 1080 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
Construction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
Read moreConstruction of the flyover on nimbi jodha degana merta city bypass section of nh 458 at (banthadi) on crossing location with sh 60 near banthadi village in didwana kuchaman districtin the state of rajasthan on epc mode
Construction of the flyover on nimbi jodha degana merta city bypass section of nh 458 at (banthadi) on crossing location with sh 60 near banthadi village in didwana kuchaman districtin the state of rajasthan on epc mode
Read moreProject monitoring consultancy for supervision monitoring quality control etc for construction of 2 lane rob lc no 89b anandi devi crossing on naipalapur kasraila road in district sitapur
Project monitoring consultancy for supervision monitoring quality control etc for construction of 2 lane rob lc no 89b anandi devi crossing on naipalapur kasraila road in district sitapur
Read moreConstruction of 02 lane rail over bridge rob on level crossing no 58b between biswan sitapur station in district sitapur on epc mode
Construction of 02 lane rail over bridge rob on level crossing no 58b between biswan sitapur station in district sitapur on epc mode
Read moreConstruction of 2 lane rail over bridge at crossing no 123a at near devipatan mandir at tulsipur gonda tulsipur rail section in district balrampur on epc mode
Construction of 2 lane rail over bridge at crossing no 123a at near devipatan mandir at tulsipur gonda tulsipur rail section in district balrampur on epc mode
Read moreConstruction of 2 lane rail over bridge at crossing no 123a at near devipatan mandir at tulsipur gonda tulsipur rail section in district balrampur up on epc mode
Construction of 2 lane rail over bridge at crossing no 123a at near devipatan mandir at tulsipur gonda tulsipur rail section in district balrampur up on epc mode
Read morePmc work for construction of 200 bedded male district hospital at district sitapur up india on epc mode
Pmc work for construction of 200 bedded male district hospital at district sitapur up india on epc mode
Read morePmc work for construction of 200 bedded male district hospital at district sitapur up india on epc mode
Pmc work for construction of 200 bedded male district hospital at district sitapur up india on epc mode
Read moreof your Industry type