Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 2 Lane Rail Over Bridge At Crossing No 123 A At Near Devipatan Mandir At Tulsipur Gonda Tulsipur Rail Section In District Balrampur On Epc Mode
|
| Description |
Construction Of 2 Lane Rail Over Bridge At Crossing No 123 A At Near Devipatan Mandir At Tulsipur Gonda Tulsipur Rail Section In District Balrampur On Epc Mode
|
| Organisation | UP STATE BRIDGE CORPORATION LIMITED | State Govt. and UT |
| Tender Id | 2025_UPSBC_1053745_1 |
|
Reference Number |
421/E-TENDER/GM AYODHYA/25-26 DT 02.07.2025 |
| Tender Fee | 23600 |
| EMD | 62.22 Lakh |
| Tender Value | |
| Place | BALRAMPUR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1916242 |
| Start Date | July 03, 2025 15:30 |
| End Date |
Expired
23/07/2025
Expired 358 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat
Construction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of 2 lane rail over bridge at crossing no 123a at near devipatan mandir at tulsipur gonda tulsipur rail section in district balrampur up on epc mode
Construction of 2 lane rail over bridge at crossing no 123a at near devipatan mandir at tulsipur gonda tulsipur rail section in district balrampur up on epc mode
Read moreConstruction of 02 lane railway portion composite girder 37.28 m center to center of expansion joint at lc no 123a at near devipatan mandir at tulsipur gonda tulsipur rail section in district balrampur on epc mode
Construction of 02 lane railway portion composite girder 37.28 m center to center of expansion joint at lc no 123a at near devipatan mandir at tulsipur gonda tulsipur rail section in district balrampur on epc mode
Read moreConstruction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Read moreConstruction of 02 lane rail over bridge rob on level crossing no 58b between biswan sitapur station in district sitapur on epc mode
Construction of 02 lane rail over bridge rob on level crossing no 58b between biswan sitapur station in district sitapur on epc mode
Read moreof your Industry type