Tender Details
Particulars | Details |
---|---|
Title |
Evacuation Of Settled Ash, Silt Etc. From Guard Pond Chambers Of Inside Plant Premises At Bktps (Phase Iv).
|
Description |
Evacuation Of Settled Ash, Silt Etc. From Guard Pond Chambers Of Inside Plant Premises At Bktps (Phase Iv).
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 75094 |
Tender Value | |
Place | BKTPP |
Link |
AAAAAAAAAA Login to view |
Start Date | May 21, 2025 14:30 |
End Date |
04/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Evacuation of settled ash, silt etc. from guard pond chambers of inside plant premises at bktps (phase-iv).
Evacuation of settled ash, silt etc. from guard pond chambers of inside plant premises at bktps (phase-iv).
Read moreManual picking of stone boulder/oversized shales, jhama coal and other refuse materials etc. received along with rom feed coal from inspection belt conveyor inside of screen houses of washery, stacking, loading and transportation of the same at chasnalla washery, sail &ndash collieries division.
Manual picking of stone boulder/oversized shales, jhama coal and other refuse materials etc. received along with rom feed coal from inspection belt conveyor inside of screen houses of washery, stacking, loading and transportation of the same at chasnalla washery, sail &ndash collieries division.
Read moreRoof treatment of various buildings inside the plant premises at dvc, mtps.
Roof treatment of various buildings inside the plant premises at dvc, mtps.
Read moreShifting of iron elimination plant from its existing position behind the pump house and construction of new foundation and drain to place the same and distribution pipeline laying at the premises of power house complex, wbsedcl, siliguri
Shifting of iron elimination plant from its existing position behind the pump house and construction of new foundation and drain to place the same and distribution pipeline laying at the premises of power house complex, wbsedcl, siliguri
Read moreRemoval of muck ,debris,boulder,plastering, micro concreting removal of silt,debris from intake,forebay and power channel etc at lingti power house under cmd,bhabanagar.
Removal of muck,debris,boulder,plastering, micro concreting removal of silt,debris from intake,forebay and power channel etc at lingti power house under cmd,bhabanagar.
Read moreRemoval of old rubber lining wherever required, and cleaning of surface, and inside/outside re-rubber lining of already fabricated flanged piping spools, tees, elbows, reducers/expanders, valves, flanges, special fittings, tanks etc at hwpk plant sit
Removal of old rubber lining wherever required, and cleaning of surface, and inside/outside re-rubber lining of already fabricated flanged piping spools, tees, elbows, reducers/expanders, valves, flanges, special fittings, tanks etc at hwpk plant sit
Read moreComprehensive drain and premises cleaning as part of monsoon preparedness ( 2025-26) at plant area, bktps.
Comprehensive drain and premises cleaning as part of monsoon preparedness ( 2025-26) at plant area, bktps.
Read moreRepair and renovation of kv school phase i panvel ongc
Repair and renovation of kv school like replacement of
 damaged chambers, sanitary lines and fittings by new,
 toilets and painting etc. at ongc panvel phase i
Read moreBiennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase # 2) inside ash pond of sgtpp
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase #2) inside ash pond of sgtpp.
Read moreConstruction of modified leach pit with silt chamber 9 nos at nahazari mouza of nahazari gram panchayet for 5hh phase iv
Construction of modified leach pit with silt chamber 9 nos at nahazari mouza of nahazari gram panchayet for 5hh phase iv
Read moreof your Industry type