Construction Of Compound Wall, Strom Water Drain And Infrastructure Facilities In Shopping Complexg Complex In Ward No07
Description
Construction Of Compound Wall, Strom Water Drain And Infrastructure Facilities In Shopping Complexg Complex In Ward No07
Organisation Directorate of Town Panchayats | State Govt. and UT
Tender Id 2025_DTP_559062_1
Reference
Number
2.Shopping Complex
Tender Fee 0
EMD 20000
Tender Value
Place Sriperumbudur Municipality
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=667703
Start Date May 19, 2025 14:35
End Date

23/05/2025 ( Expired 10 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project

Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep

Read more
Selection of epc contractor for chitrakoot link expressway

Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode

Read more
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode

Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode

Read more
Construction of rcc draintotal 8.06 km of nh-512 nh division vii

Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569