Tender Details

Particulars Details
Title
Construction Of Balance Work Of Link Road From Laran To Sarli Via Khalara Km. 2/510 To 6/660 Sh Rofd, R/Wall, B/Wall, Hume Pipe Culvert, Slab Culvert And Unlined Surface Drain Etc. Under Nabard Ridf Xxvi.
Description
Construction Of Balance Work Of Link Road From Laran To Sarli Via Khalara Km. 2/510 To 6/660 Sh Rofd, R/Wall, B/Wall, Hume Pipe Culvert, Slab Culvert And Unlined Surface Drain Etc. Under Nabard Ridf Xxvi.
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_97075_1
Reference
Number
No.8772-8871 dated 21.12.2024
Tender Fee 5000
EMD 4.73 Lakh
Tender Value
Place Kullu
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=142530
Start Date December 25, 2024 19:00
End Date

31/12/2024 ( Expired 112 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
R/r damages on prem nagar chandog girdh sandrol road km 0/0 to 15/0 (sh- c/o 900 mm dia hume pipe culvert alobhwith wing wall at rd 9/255 pcc u shape drain at rd 9/200 to 9/330 damages due to disaster.

R/r damages on prem nagar chandog girdh sandrol road km 0/0 to 15/0 (sh- c/o 900 mm dia hume pipe culvert alobhwith wing wall at rd 9/255 pcc u shape drain at rd 9/200 to 9/330 damages due to disaster.

Read more
Maintenance of road from td road to assam border under damcherra sub division pwd r and b during the year 2025 26 sh surface drains, pucca drains, cd s wing wall, cd and landslide clearance, paver block, pucca drain etc.

Maintenance of road from td road to assam border under damcherra sub division pwd r and b during the year 2025 26 sh surface drains, pucca drains, cd s wing wall, cd and landslide clearance, paver block, pucca drain etc

Read more
Link road from bhawai to jiyad via jogi bag (gp bhawai) km. 0/00 to 13/00 (sh c/o 900 mm dia hume pipe culvert at rd. 0/075 and 3/260) under scsp

Link road from bhawai to jiyad via jogi bag (gp bhawai) km. 0/00 to 13/00 (sh c/o 900 mm dia hume pipe culvert at rd. 0/075 and 3/260) under scsp

Read more
Link road from bhawai to jiyad via jogi bag (gp bhawai) km. 0/00 to 13/00 (sh c/o 900 mm dia hume pipe culvert at rd. 0/075 and 3/260) under scsp

Link road from bhawai to jiyad via jogi bag (gp bhawai) km. 0/00 to 13/00 (sh c/o 900 mm dia hume pipe culvert at rd. 0/075 and 3/260) under scsp

Read more
Construction of link road from rail to bassa km 0/0 to 1/600 (sh formation curring 5/7 mtr wide c/o r/wall and 900mm dia hume pipe culvert at rd 0/180 0/255 and 0/345) under otmnp

Construction of link road from rail to bassa km 0/0 to 1/600 (sh formation curring 5/7 mtr wide c/o r/wall and 900mm dia hume pipe culvert at rd 0/180 0/255 and 0/345) under otmnp

Read more
Upgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.

Upgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.

Read more
Construction of link road from tanta to draman via kuthal by way of earthwork 3 00 mtrs span rcc culvert 900 mm dia hp culvert 6 00 mtrs rcc culvert 3 00 mtrs height semi pucca r wall 2 00 mtrs height semi pucca r wall 2 50 mtrs height semi puc

Construction of link road from tanta to draman via kuthal by way of earthwork 3 00 mtrs span rcc culvert 900 mm dia hp culvert 6 00 mtrs rcc culvert 3 00 mtrs height semi pucca r wall 2 00 mtrs height semi pucca r wall 2 50 mtrs height semi puc

Read more
Fdr/mtc. of road from rajibnagar to rupaichari via garifa (rpc part) (l- 4.00km) / sh- construction of 2(two) nos rcc boxcell, approach road, wing wall etc. under pwd(r and b) rupaichari sub-division during the year 2024-25. (2nd call)

Fdr/mtc. of road from rajibnagar to rupaichari via garifa (rpc part) (l- 4.00km) / sh- construction of 2(two) nos rcc boxcell, approach road, wing wall etc. under pwd(r and b) rupaichari sub-division during the year 2024-25. (2nd call)

Read more
Fdr mtc. of road from krishnatali to harijoy chowdhury para via brajanagar under jirania sub division pwd (r and b) during the year 2024-2025 sh protection of road embankment by providing c.c toe wall and construction of trapizoidal drain etc.

Fdr mtc. of road from krishnatali to harijoy chowdhury para via brajanagar under jirania sub division pwd (r and b) during the year 2024-2025 sh protection of road embankment by providing c.c toe wall and construction of trapizoidal drain etc.

Read more
C/o link road to harijan basti kuthar beet km 0/00 to 2/500 (sh c/o of 3.00 m span rcc slab at rd 0/810, c/o r/wall wall at rd. 1/930 to 1/940 lhs, 1/740 to 1/750 rhs, c/o c.c. pavement rd 1/660 to 1/690 ,p/l 60mm thick paver at rd 2/450 to 2/50

C/o link road to harijan basti kuthar beet km 0/00 to 2/500 (sh c/o of 3.00 m span rcc slab at rd 0/810, c/o r/wall wall at rd. 1/930 to 1/940 lhs, 1/740 to 1/750 rhs, c/o c.c. pavement rd 1/660 to 1/690 ,p/l 60mm thick paver at rd 2/450 to 2/50

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise