Tender Details

Particulars Details
Title
Work For Extra Two Phase Laying Special Deer Conductor
Description
Work For Extra Two Phase Laying Special Deer Conductor On 132 Kv Itwa Shohrathgarh Tss Line In Between River Crossing Tower
Organisation UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT
Tender Id 2024_UPTCL_942303_1
Reference
Number
E-tender no.08
Tender Fee 590
EMD 1000
Tender Value
Place 132 KV SUB STATION ITWA
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1630880
Start Date July 30, 2024 22:40
End Date

23/08/2024 ( Expired 276 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Phase-2 - driver and final stage amplifiers for 2 sets of

Phase-2 - driver and final stage amplifiers for 2 sets of&#x0d iter icrf sources

Read more
Invitation of bids to develop vasco city to goa international airport (dabolim) petroleum and petroleum products (atf) pipeline

Grant of authorization for laying, building, operating or expanding petroleum and petroleum product (atf) pipeline from vasco city to goa international airport (dabolim)

Read more
Invitation of bids to develop kheda to sardar vallabhbhai patel international airport petroleum and petroleum products (atf) pipeline

Grant of authorization for laying, building, operating or expanding petroleum and petroleum product (atf) pipeline from kheda to sardar vallabhbhai patel international airport

Read more
Invitation of bids to develop visakhapatnam to visahapatnam international airport (bhogapuram) petroleum and petroleum products (atf) pipeline

Grant of authorization for laying, building, operating or expanding petroleum and petroleum product (atf) pipeline from visakhapatnam to visahapatnam international airport (bhogapuram)

Read more
Invitation of bids to develop ernakulam to trivandrum international airport petroleum and petroleum products (atf) pipeline

Grant of authorization for laying, building, operating or expanding petroleum and petroleum product (atf) pipeline from ernakulam to trivandrum international airport

Read more
Invitation of bids to develop loni, pune to pune international airport petroleum and petroleum products (atf) pipeline

Grant of authorization for laying, building, operating or expanding petroleum and petroleum product (atf) pipeline from loni, pune to pune international airport

Read more
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise