Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Travel Wheels In Standby Shaft For The Tippler Installed At 30000 Te Ground Bunker For C4 Conveyor Of Back Up Gevra Project.
|
| Description |
Replacement Of Travel Wheels In Standby Shaft For The Tippler Installed At 30000 Te Ground Bunker For C4 Conveyor Of Back Up Gevra Project.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_334520_1 |
|
Reference Number |
SECL/GA/SOENM/ 25-26/E-TENDER/16 Dt. 24/04/2025 |
| Tender Fee | 0 |
| EMD | 2800 |
| Tender Value | - |
| Place | Gevra Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346775 |
| Start Date | April 26, 2025 15:30 |
| End Date |
Expired
07/05/2025
Expired 526 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication, and erection of steel structure of c and r series of conveyor, gantry and ground bunker 30000 te and 5000 te for strengthening as per ndt recommendations of back up gevra project.
Fabrication, and erection of steel structure of c and r series of conveyor, gantry and ground bunker 30000 te and 5000 te for strengthening as per ndt recommendations of back up gevra project.
Read moreWork of dismantling, fabrication and erection of steel structure of s2 conveyor gantry and s2 steel bunker of chp of gevra project.
Work of dismantling, fabrication and erection of steel structure of s2 conveyor gantry and s2 steel bunker of chp of gevra project.
Read moreCleaning spillage coal and debris along 16dip belt conveyor from main bunker to 500-te bunker in r-v seam of khottadih colliery, pandaveswar area
Cleaning spillage coal and debris along 16dip belt conveyor from main bunker to 500-te bunker in r-v seam of khottadih colliery, pandaveswar area
Read moreAnnual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion ( small belt) at gevra project of gevra area.
Annual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion ( small belt) at gevra project of gevra area.
Read moreAnnual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion (small belt) at gevra project of gevra area
Annual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion (small belt) at gevra project of gevra area
Read moreAnnual assistance jobs for clearning and removal of deposited silt from existing drains, and floors of conveyor belt of jk series including cross drains of bunker portion (small belt) at gevra project of gevra area
Annual assistance jobs for clearning and removal of deposited silt from existing drains, and floors of conveyor belt of jk series including cross drains of bunker portion (small belt) at gevra project of gevra area
Read moreAnnual assistance jobs for cleaning and removal of deposited silt from existing drains, and floors of conveyor belt of jk series including cross drains of bunker portion (small belt) at gevra project of gevra area.(2nd call)
Annual assistance jobs for cleaning and removal of deposited silt from existing drains, and floors of conveyor belt of jk series including cross drains of bunker portion (small belt) at gevra project of gevra area.(2nd call)
Read moreDismantling, fabrication and erection of discharge chute, walkway of gantry and tippler chute, vibrator linear plate etc of c and r series of conveyor for a period of 01 year on as and when required basis of backup gevra project
Dismantling, fabrication and erection of discharge chute, walkway of gantry and tippler chute, vibrator linear plate etc of c and r series of conveyor for a period of 01 year on as and when required basis of backup gevra project
Read moreof your Industry type