Tender Details

About Tender

🏗️ Invitation For Earth Filling Services At Madhudanga Rehab Site 🏗️ Eastern Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids For The Provision Of Earth Filling Services At The Plots Of Pa Fs Located At The Madhudanga Rehabilitation Site Within The Sonepur Bazari Area. 📅 Bid Submission Deadline: June 05, 2024, 6:00 Pm The Tender Fee Is Set At Inr 72,700. Interested Contractors Must Submit Detailed Bids, Including Method Statements, Machinery Specifications, And Timelines For Project Completion. Keywords: Earth Filling, Pa Fs, Madhudanga Rehab Site, Sonepur Bazari Area, Eastern Coalfields Limited, Psu, Tender, Bid Submission
Particulars Details
Title
Earth Filling In The Plots Of Pa Fs At Madhudanga Rehab Site Under S B Area
Description
Earth Filling In The Plots Of Pa Fs At Madhudanga Rehab Site Under S B Area
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_308331_1
Reference
Number
GM/SBA/CE/e-Tender/24-25/07 Dated 17-05-2024
Tender Fee 0
EMD 72700
Tender Value
Place Sonepur Bazari Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319614
Start Date May 20, 2024 23:30
End Date

05/06/2024 ( Expired 373 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Read more
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Read more
Repair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar

Repair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar

Read more
Provision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur

Provision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur &#x0d &#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise