Tender Details
Particulars | Details |
---|---|
Title |
“ Slip Ring Motor Starter 3 Phase, Suitable For 93 K. W. , 4 Pole Motor, Rotor Amps 208&Rotor Volt
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/5928956 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 09, 2025 18:02 |
End Date |
03/03/2025 ( Expired 96 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreSc050260140-160 kw, 315l, b3, 1485 rpm, lt motor,sc050260450-110kw, 3 phase, 4 pole, frame-315m, v-
Read more
Annual rate contract for repair and rewinding of 415 v 3-phase lt ac motor rating 30 kw or less and 125 v dc motor at pps-1.
Annual rate contract for repair and rewinding of 415 v 3-phase lt ac motor rating 30 kw or less and 125 v dc motor at pps-1 as per tender&#x0d
Read more3 phase squirrel cage induction motor copper winding. kw- 0.37, hp- 0.5, pole- 4, rpm- 1440, frame
Read more
Construction combined house for srilankan tamil refugees camp phase iii - 2025-26. combined house unit no.43-63 (21 units with 4 houses per unit ) at m.mettupatty panchayat erumapatty block of namakkal district pkg.no 3/2025
Construction combined house for srilankan tamil refugees camp phase iii - 2025-26. combined house unit no.43-63 (21 units with 4 houses per unit ) at m.mettupatty panchayat erumapatty block of namakkal district pkg.no 3/2025
Read moreSupply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Supply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Read moreRepairing of 3 nos. ers for pump motors at pump house of workshop, compressor motor (90 kw) of dozer section 415v, 3 phase under dipka expansion project.
Repairing of 3 nos. ers for pump motors at pump house of workshop, compressor motor (90 kw) of dozer section 415v, 3 phase under dipka expansion project.
Read moreMccb 200a, 440v 4 pole 3 phase,mccb 400a, 440v 4 pole 3phase,push buttom switch,push buttom switch,
Read more
Comprehensive annual maintenance contract for civil works at phase 1, phase 3, phase 4 and kollam campuses of technopark, trivandrum (building and campus maintenance work), 2025-2026
Comprehensive annual maintenance contract for civil works
Read moreof your Industry type