Tender Details

About Tender

🛠️ Bid Invitation For Miscellaneous Work At Western Coalfields Limited 🏭 Western Coalfields Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For A Miscellaneous Work Package. The Scope Of Work Includes The Repair Of One Drive Drum Shaft Of A Link Belt Fitted At The Naigaon Chp Within The Neeljay Sub Area, Wani Area. 📅 Bid Submission Deadline: May 27, 2024, 2:00 Pm Interested Bidders Are Requested To Submit Detailed Proposals, Including Technical Capabilities, Experience, And Pricing, To Undertake The Specified Repair Work. No Tender Fee Or Earnest Money Deposit (Emd) Is Required For Participation. Keywords: Miscellaneous Work, Repair, Drive Drum Shaft, Link Belt, Western Coalfields Limited, Central Government, Chp, Neeljay Sub Area, Wani Area
Particulars Details
Title
Miscellaneous Work
Description
1 Nos E N M Misc Job Such As 1 Repairing Of Drive&#X0d Drum Shaft Of Link Belt Fitted At Naigaon Chp
Organisation Western Coalfields Limited | Central Govt. Ministry/Department
Tender Id 2024_WCL_756925_1
Reference
Number
Wa 4316 enm 0004 2024 25
Tender Fee 0
EMD 0
Tender Value
Place Bellora Naigaon Deep OCM Neeljay Sub Area Wani Are
Link https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1060383
Start Date May 20, 2024 19:30
End Date

27/05/2024 ( Expired 388 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Read more
Landslide treatment work of 08 locations (ch. 238.750 km to 238.920 km, ch. 246.790 km to 246.850 km, ch. 247.340 km to 247.440 km, ch. 254.340 km to 254.410 km, ch. 261.550 km to 261.680 km, ch. 281.600 to ch. 281.925 km, ch. 283.250 km to 283.500 k

Landslide treatment work of 08 locations (ch. 238.750 km to 238.920 km, ch. 246.790 km to 246.850 km, ch. 247.340 km to 247.440 km, ch. 254.340 km to 254.410 km, ch. 261.550 km to 261.680 km, ch. 281.600 to ch. 281.925 km, ch. 283.250 km to 283.500 k

Read more
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Read more
Completion of incomplete work of provn of 01 mw solar power plant work at vadodara

Completion of incomplete work of provn of 01 mw solar power plant work at vadodara

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Work of providing and fixing of 2x400 watt high mast light fitting and 2x100 watt aviation light for lighting arrangement at 220 kv s/s katrari, deoria under etd, deoria

Work of providing and fixing of 2x400 watt high mast light fitting and 2x100 watt aviation light for lighting arrangement at 220 kv s/s katrari, deoria under etd, deoria

Read more
External electrification works.

Construction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur. - external electrification works.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise