Tender Details
Particulars | Details |
---|---|
Title |
Lowering/Shifting Of 3 Nos 4000 Gpm Pump Motor And 1 Nos 2000 Gpm Pump Motor And 1 Nos 1000 Gpm Pump Motor Including Dismentling And Re Joining/ Extension Of Delivery Range Of 10 Inch Dia 900 Mtr Pipes Short Pieces And Bend 8 Inch Dia
|
Description |
Lowering/Shifting Of 3 Nos 4000 Gpm Pump Motor And 1 Nos 2000 Gpm Pump Motor And 1 Nos 1000 Gpm Pump Motor Including Dismentling And Re Joining/ Extension Of Delivery Range Of 10 Inch Dia 900 Mtr Pipes Short Pieces And Bend 8 Inch Dia
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_321798_1 |
Reference Number |
BCCL/LA/EnM/F-19/24-25/136 |
Tender Fee | 0 |
EMD | 14900 |
Tender Value | |
Place | Lodna Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333565 |
Start Date | November 24, 2024 15:30 |
End Date |
05/12/2024 ( Expired 185 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Making of nipples, bends, and short pieces needed for extension of the 8 inch dia m.s. delivery pipeline of the pumps, in operation in mine, w.r.t. karo ocp, under bnk area.
Making of nipples, bends, and short pieces needed for extension of the 8 inch dia m.s. delivery pipeline of the pumps, in operation in mine, w.r.t. karo ocp, under bnk area.
Read moreDismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read more(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an
(1) making of 04 nos. of 
 motor dala end cover and 
 04 nos.bearing grease cap 
 of at akwmc for 150hp and 
 167 hp.(2) fabrication of 
 base plate h.t pump motor 
 to be installed at ocp 
 pump.(3) dismantling of 
 3000 gpm pump flow more an
Read moreTransporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Transporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Read moreFabrication of base plate /frame for 4000gpm/2000gpm pump motor set at sb workshop(ii) fabrication of foot valve 04 nos. bend 8 nos. short piece sluice valve and n.r valve 4 nos. pump body short piece
For fabrication of base plate /frame for 4000gpm/2000gpm pump motor set at sb workshop(ii) fabrication of foot valve 04 nos. bend 8 nos. short piece sluice valve and n.r valve 4 nos. pump body short piece 8 nos.in different size for pumping of nichit
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read moreTransportation and installation of 1000 gpm pump with motor at 124l/8d to132l/02d including laying and fitting of 6 inch diameter pipe line from 132l/02d to 123l/7d and connecting with existing pipe line for borehole at 110l.laying and installation
Transportation and installation of 1000 gpm pump with motor at 124l/8d to132l/02d including laying and fitting of 6 inch diameter pipe line from 132l/02d to 123l/7d and connecting with existing pipe line for borehole at 110l.laying and installation
Read moreVarious material handling work including 2 nos. of bed -plate fabrication , reinstalling of damaged 8 inch and 6 inch pipe (vertical range) and bend and short piece refabricating work at adic, kusunda area
Various material handling work including 2 nos. of bed -plate fabrication , reinstalling of damaged 8 inch and 6 inch pipe (vertical range) and bend and short piece refabricating work at adic, kusunda area
Read more(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
Read moreof your Industry type