Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Proposed R.O.B. And Its Approaches In Replacement Of Existing Level Crossing No.21 X At Km Ch.107/500 Of Nh 64 District Anand In The State Of Gujarat
|
Description |
Construction Of Proposed R.O.B. And Its Approaches In Replacement Of Existing Level Crossing No.21 X At Km Ch.107/500 Of Nh 64 District Anand In The State Of Gujarat
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 53.27 Lakh |
Tender Value | |
Place | Vadodara |
Link |
AAAAAAAAAA Login to view |
Start Date | February 02, 2025 00:00 |
End Date |
20/08/2025 ( 40 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation of construction of six lane highway corridor from ch. 8/500 to 33/500 and upgradation of existing highway to six lanes from ch. 8/500 to 40/00 section at grade section of hadapsar yevat (nh-65) in the state of maharashtra
Upgradation of construction of six lane highway corridor &#x0d from ch. 8/500 to 33/500 and upgradation of existing &#x0d highway to six lanes from ch. 8/500 to 40/00 section at&#x0d grade section of hadapsar yevat (nh-65) in the state of &#x0d maharashtra
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreBalance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode
Balance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode
Read moreConstruction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreConsrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe
Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreof your Industry type