Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Twenty Cc Aerial Target System,Wing Span,Fuselage,Enginee,Servo
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/4059653 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | October 09, 2023 15:33 |
| End Date |
Expired
19/10/2023
Expired 1095 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ANWAR MODELS | - | 14-10-2023 17:45:40 | N/A | Qualified |
| 2 | M/S PRIME SYSTEM & COMMUNICATION | - | 18-10-2023 17:40:13 | N/A | Qualified |
| 3 | UNIQUE ENTERPRISES | - | 18-10-2023 13:34:23 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | ANWAR MODELS | Item Categories : Twenty CC Aerial Target System,Wing Span,Fuselage,Enginee,Servo | 99904.00 | L1 |
| 2 | UNIQUE ENTERPRISES (MSE)( MSE Social Category:General ) | Item Categories : Twenty CC Aerial Target System,Wing Span,Fuselage,Enginee,Servo | 101710.00 | L2 |
| 3 | M/S PRIME SYSTEM & COMMUNICATION | Item Categories : Twenty CC Aerial Target System,Wing Span,Fuselage,Enginee,Servo | 102740.00 | L3 |
A vehicle log book,b vehicle log book,sleeve for aerial target,green camouflage net,distilled water,touch wood,sand model colour 250 gm,eqpt marking paint
A vehicle log book,b vehicle log book,sleeve for aerial target,green camouflage net,distilled water,touch wood,sand model colour 250 gm,eqpt marking paint
Read moreDesign supply installation testing and commissioning of 60 kva unbalanced type servo voltage stablizer along with allied works to be installed for server room high court wing at honble high court complex jammu
Design supply installation testing and commissioning of 60 kva unbalanced type servo voltage stablizer along with allied works to be installed for server room high court wing at honble high court complex jammu
Read moreRestoration of rain damages onkalhel chatri jungrar road km 0/0 to 7/0 (sh c/o bed plate dirt wall wheel guard railing sabl etc. of 3.00 mtr span culvert at rd 3/380 and5/305 along with wing walls)
Restoration of rain damages onkalhel chatri jungrar road km 0/0 to 7/0 (sh c/o bed plate dirt wall wheel guard railing sabl etc. of 3.00 mtr span culvert at rd 3/380 and5/305 along with wing walls)
Read moreCover for main under carriage pneumatic system,cover for nose under carriage,cover for right stabilizer,cover for right vsu-72 launcher,cover for left vsu-72 launcher,cover for item p-72 1db2,cover for aku 170 e,cover for aku-470 article for stns 1,3,4,5,6,cover for right air intake,cover for left air intake,cover for after burner nozzle of item 96,cover for right wing panel,cover for right canard,cover for left canard,fuselage cover,cover for uninstalled engine
Cover for main under carriage pneumatic system,cover for nose under carriage,cover for right stabilizer,cover for right vsu-72 launcher,cover for left vsu-72 launcher,cover for item p-72 1db2,cover for aku 170 e,cover for aku-470 article for stns 1,3,4,5,6,cover for right air intake,cover for left air intake,cover for after burner nozzle of item 96,cover for right wing panel,cover for right canard,cover for left canard,fuselage cover,cover for uninstalled engine
Read moreUniversal uav training and simulation platform,computer desks,split air conditioners 2 ton,backlit acrylic information boards,drone training obstacle course,fixed wing hybrid vertical take off and landing unmanned aerial system,fpv uav with spherical crash guard,training lm vtol,ground control station,ground data terminal,modular transport and deployment case for vtol,training person for system for 7 days,15 inch grenade dropper,radio controller 5 and half inch,15 inch 8s 10000 mah lipo battery
Universal uav training and simulation platform,computer desks,split air conditioners 2 ton,backlit acrylic information boards,drone training obstacle course,fixed wing hybrid vertical take off and landing unmanned aerial system,fpv uav with spherical crash guard,training lm vtol,ground control station,ground data terminal,modular transport and deployment case for vtol,training person for system for 7 days,15 inch grenade dropper,radio controller 5 and half inch,15 inch 8s 10000 mah lipo battery
Read moreTaking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span
Taking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span
Read moreof your Industry type